Industrial Assessment Centers
Assessment #UD0791
| Assessment Year | 2009 |
|---|---|
| SIC | 3069 |
| SIC Description | Fabricated Rubber Products, Nec |
| NAICS | 326192 |
| NAICS Description | Resilient Floor Covering Manufacturing |
| Principal Product | Rubber Flooring |
| Sales | $ 12,000,000 |
| # of Employees | 80 |
| Plant Area (Sq.Ft.) | 105,000 |
| Annual Production | 8,500,000 Pounds |
| Production Hrs. Annual | 2,500 |
| Location (State) | OH |
| Yearly Energy Cost | $ 1,122,121 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,034,918 kWh | $ 455,652 | $ 0.113 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
65,146 MMBtu | $ 666,469 | $ 10.23 /MMBtu |
TOTAL ENERGY |
106,504 MMBtu | $ 1,122,121 | $ 10.54 /MMBtu |
Water Disposal |
24,678 Gal | $ 25,379 | $ 1 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,088,092 kWh 514,358 kWh |
$ 79,962 $ 19,064 |
17.55 % 4.18 % |
$ 0.113 /kWh |
- Electricity Fees |
- |
$ 11,737 $ 11,737 |
0.00 % 0.00 % |
- |
Natural Gas |
27,839 MMBtu 25,687 MMBtu |
$ 284,789 $ 262,774 |
42.73 % 39.43 % |
$ 10.23 /MMBtu |
TOTAL ENERGY |
38,992 MMBtu 30,959 MMBtu |
$ 376,488 $ 293,575 |
33.55 % 26.16 % |
$ 10.54 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 1 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | 2.1231 | I | $ 20,000 | $ 180,324 | 0.11 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | 2.2114 | I | $ 0 | $ 66,274 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | N | $ 28,000 | $ 43,743 | 0.64 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | I | $ 0 | $ 12,848 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
PAY BILLS ON TIME TO AVOID LATE FEES | 4.8210 | I | $ 0 | $ 11,737 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 2,358 | $ 11,734 | 0.20 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | 2.1243 | I | $ 336 | $ 11,202 | 0.03 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | N | $ 15,000 | $ 9,772 | 1.53 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 15,000 | $ 7,364 | 2.04 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 2,164 | $ 4,648 | 0.47 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | N | $ 8,000 | $ 2,940 | 2.72 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 12 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 12,625 | $ 2,512 | 5.03 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 13 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 7,735 | $ 2,250 | 3.44 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 14 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 6,668 | $ 1,996 | 3.34 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 15 | view details |
CLOSE OFF UNNEEDED STEAM LINES | 2.2153 | I | $ 1,100 | $ 1,974 | 0.56 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 16 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 924 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 17 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,000 | $ 552 | 1.81 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||