Assessment #UD0721
| Assessment Year | 2005 |
|---|---|
| SIC | 3357 |
| SIC Description | Nonferrous Wiredrawing & Insulating |
| NAICS | 331422 |
| NAICS Description | Copper Wire (except Mechanical) Drawing |
| Principal Product | Insulated Copper Wire |
| Sales | $ 140,000,000 |
| # of Employees | 88 |
| Plant Area (Sq.Ft.) | 367,000 |
| Annual Production | 25,000,000 Tons |
| Production Hrs. Annual | 8,736 |
| Location (State) | IN |
| Yearly Energy Cost | $ 829,418 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
13,417,532 kWh | $ 233,962 | $ 0.017 /kWh |
- Demand Charge |
27,360 kW | $ 358,676 | $ 13.11 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
36,858 MMBtu | $ 236,780 | $ 6.42 /MMBtu |
TOTAL ENERGY |
174,388 MMBtu | $ 829,418 | $ 4.76 /MMBtu |
Water Disposal |
9,012,001 Gal | $ 35,445 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,570,919 kWh 1,371,393 kWh |
$ 26,708 $ 23,315 |
11.42 % 9.97 % |
$ 0.017 /kWh |
- Demand Charge |
3,650 kW 2,256 kW |
$ 32,836 $ 29,824 |
9.15 % 8.32 % |
$ 13.11 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,529 MMBtu 4,450 MMBtu |
$ 28,851 $ 28,345 |
12.18 % 11.97 % |
$ 6.42 /MMBtu |
TOTAL ENERGY |
20,631 MMBtu 18,507 MMBtu |
$ 88,395 $ 81,484 |
10.66 % 9.82 % |
$ 4.76 /MMBtu |
Water Disposal |
142,139 Gal 142,139 Gal |
$ 559 $ 559 |
1.58 % 1.58 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
RECOVER MECHANICAL ENERGY | 2.4311 | I | $ 413,938 | $ 206,969 | 2.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 86,100 | $ 30,010 | 2.87 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
REPAIR AND ELIMINATE STEAM LEAKS | 2.2135 | I | $ 160 | $ 11,745 | 0.01 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | I | $ 12,000 | $ 11,579 | 1.04 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 0 | $ 5,580 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 11,100 | $ 5,040 | 2.20 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 345 | $ 2,714 | 0.13 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE | 2.4131 | N | $ 860 | $ 1,229 | 0.70 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 09 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 1,820 | $ 675 | 2.70 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 10 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 0 | $ 614 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 11 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 420 | $ 613 | 0.69 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 12 | view details |
INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | 2.4113 | N | $ 1,000 | $ 560 | 1.79 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 13 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 1,897 | $ 506 | 3.75 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||