| Assessment Year | 2009 |
|---|---|
| SIC | 2426 |
| SIC Description | Hardwood Dimension & Flooring Mills |
| NAICS | 321918 |
| NAICS Description | Other Millwork (including Flooring) |
| Principal Product | Wood Flooring |
| Sales | $ 26,000,000 |
| # of Employees | 108 |
| Plant Area (Sq.Ft.) | 200,000 |
| Annual Production | 26,000 Thousand Feet |
| Production Hrs. Annual | 7,200 |
| Location (State) | AL |
| Yearly Energy Cost | $ 1,134,076 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
14,117,478 kWh | $ 822,225 | $ 0.058 /kWh |
- Demand Charge |
38,994 kW | $ 169,288 | $ 4.34 /kW |
- Electricity Fees |
- | $ 0 | - |
Wood |
121,712 MMBtu | $ 142,563 | $ 1.17 /MMBtu |
TOTAL ENERGY |
266,416 MMBtu | $ 1,134,076 | $ 4.26 /MMBtu |
Water Disposal |
25,145,500 Gal | $ 69,359 | $ 0 /Gal |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
873,537 kWh 420,063 kWh |
$ 45,043 $ 21,659 |
5.48 % 2.63 % |
$ 0.058 /kWh |
- Demand Charge |
1,677 kW 770 kW |
$ 7,244 $ 3,326 |
4.28 % 1.96 % |
$ 4.34 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Wood |
7,445 MMBtu 0 MMBtu |
$ 9,249 $ 0 |
6.49 % 0.00 % |
$ 1.17 /MMBtu |
TOTAL ENERGY |
16,399 MMBtu 4,306 MMBtu |
$ 61,536 $ 24,985 |
5.43 % 2.20 % |
$ 4.26 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 12,118 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 3,000 | $ 9,713 | 0.31 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 0 | $ 263 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 58,596 | $ 27,302 | 2.15 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
USE PHOTOCELL CONTROLS | 2.7134 | I | $ 1,394 | $ 1,324 | 1.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | 2.1243 | N | $ 6,000 | $ 1,493 | 4.02 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 1,858 | $ 458 | 4.06 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | I | $ 850 | $ 1,109 | 0.77 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
USE HOT FLUE GASES TO PREHEAT WASTES FOR INCINERATOR BOILER | 2.2413 | N | $ 17,820 | $ 5,636 | 3.16 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 1,018 | $ 1,021 | 1.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 1,031 | $ 1,099 | 0.94 | ||||||||||||||||
|
|||||||||||||||||||||||