Assessment #TT0081
| Assessment Year | 2011 |
|---|---|
| SIC | 2085 |
| SIC Description | Distilled And Blended Liquors |
| NAICS | 312140 |
| NAICS Description | Distilleries |
| Principal Product | Beverage Alcohol |
| Sales | $ 2,147,483,647 |
| # of Employees | 370 |
| Plant Area (Sq.Ft.) | 1,000,000 |
| Annual Production | 23,772 Thousand Gallons |
| Production Hrs. Annual | 8,760 |
| Location (State) | TN |
| Yearly Energy Cost | $ 5,911,108 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
38,838,000 kWh | $ 1,958,100 | $ 0.050 /kWh |
- Demand Charge |
72,073 kW | $ 978,432 | $ 13.58 /kW |
- Electricity Fees |
- | $ 47,830 | - |
Natural Gas |
31,795 MMBtu | $ 198,719 | $ 6.25 /MMBtu |
Wood |
1,032,051 MMBtu | $ 2,728,028 | $ 2.64 /MMBtu |
TOTAL ENERGY |
1,461,940 MMBtu | $ 5,911,108 | $ 4.04 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
5,235,652 kWh 1,288,100 kWh |
$ 298,544 $ 73,350 |
15.25 % 3.75 % |
$ 0.050 /kWh |
- Demand Charge |
7,835 kW 2,192 kW |
$ 96,914 $ 27,116 |
9.91 % 2.77 % |
$ 13.58 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 6.25 /MMBtu |
Wood |
6,394 MMBtu 0 MMBtu |
$ 18,000 $ 0 |
0.66 % 0.00 % |
$ 2.64 /MMBtu |
TOTAL ENERGY |
60,060 MMBtu 13,203 MMBtu |
$ 413,458 $ 100,466 |
6.99 % 1.70 % |
$ 4.04 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE COMBUSTION AIR FLOW TO OPTIMUM | 2.1113 | N | $ 24,500 | $ 89,000 | 0.28 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE STEAM PRESSURE REDUCTION TO GENERATE POWER | 2.3321 | N | $ 553,850 | $ 204,112 | 2.71 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | N | $ 44,000 | $ 18,218 | 2.42 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 5 | $ 1,662 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 103,900 | $ 58,700 | 1.77 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 70,320 | $ 34,694 | 2.03 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 8,160 | $ 2,492 | 3.27 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 22,680 | $ 4,580 | 4.95 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||