Industrial Assessment Centers
Assessment #TT0032
| Assessment Year | 2009 |
|---|---|
| SIC | 2426 |
| SIC Description | Hardwood Dimension & Flooring Mills |
| NAICS | 321918 |
| NAICS Description | Other Millwork (including Flooring) |
| Principal Product | Hardwood Flooring |
| Sales | $ 1 |
| # of Employees | 350 |
| Plant Area (Sq.Ft.) | 80,000 |
| Annual Production | 25,000 Thousand Feet |
| Production Hrs. Annual | 4,500 |
| Location (State) | TN |
| Yearly Energy Cost | $ 1,169,430 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
17,647,764 kWh | $ 776,710 | $ 0.044 /kWh |
- Demand Charge |
43,096 kW | $ 261,569 | $ 6.07 /kW |
- Electricity Fees |
- | $ 111,502 | - |
Natural Gas |
18,984 MMBtu | $ 19,649 | $ 1.04 /MMBtu |
TOTAL ENERGY |
199,875 MMBtu | $ 1,169,430 | $ 5.85 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
994,557 kWh 72,054 kWh |
$ 43,761 $ 3,170 |
5.63 % 0.41 % |
$ 0.044 /kWh |
- Demand Charge |
3,242 kW 0 kW |
$ 3,910 $ 0 |
1.49 % 0.00 % |
$ 6.07 /kW |
- Electricity Fees |
- |
$ 7,220 $ 0 |
6.48 % 0.00 % |
- |
Natural Gas |
525 MMBtu 0 MMBtu |
$ 865 $ 0 |
4.40 % 0.00 % |
$ 1.04 /MMBtu |
TOTAL ENERGY |
10,719 MMBtu 739 MMBtu |
$ 55,756 $ 3,170 |
4.77 % 0.27 % |
$ 5.85 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | 2.6221 | N | $ 0 | $ 17,837 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 57,000 | $ 15,496 | 3.68 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 7,000 | $ 6,704 | 1.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 10,250 | $ 3,906 | 2.62 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 5,100 | $ 3,681 | 1.39 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 10,200 | $ 2,851 | 3.58 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 2,500 | $ 3,170 | 0.79 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 800 | $ 1,246 | 0.64 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | N | $ 1,600 | $ 880 | 1.82 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | 2.2443 | N | $ 1,730 | $ 865 | 2.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||