Industrial Assessment Centers
Assessment #TN0600
| Assessment Year | 1997 |
|---|---|
| SIC | 2521 |
| SIC Description | Wood Office Furniture |
| NAICS | |
| NAICS Description | |
| Principal Product | Ready-to-assemble wooden furniture |
| Sales | $ 16,000,000 |
| # of Employees | 347 |
| Plant Area (Sq.Ft.) | 300,000 |
| Annual Production | 130,000 Pieces |
| Production Hrs. Annual | 6,240 |
| Location (State) | VA |
| Yearly Energy Cost | $ 389,344 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,876,905 kWh | $ 162,993 | $ 0.021 /kWh |
- Demand Charge |
13,376 kW | $ 75,708 | $ 5.66 /kW |
- Electricity Fees |
- | $ 90,583 | - |
LPG |
8,594 MMBtu | $ 60,060 | $ 6.99 /MMBtu |
TOTAL ENERGY |
89,332 MMBtu | $ 389,344 | $ 4.36 /MMBtu |
Other Liquid (non-haz) |
60,000 Gal | $ 58,920 | $ 0 /Gal |
Solid Waste (non-haz) |
10,800,000 lbs | $ 476,690 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,403,282 kWh 1,576,788 kWh |
$ 38,455 $ 25,230 |
23.59 % 15.48 % |
$ 0.021 /kWh |
- Demand Charge |
132 kW 132 kW |
$ 3,250 $ 3,250 |
4.29 % 4.29 % |
$ 5.66 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
LPG |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 6.99 /MMBtu |
TOTAL ENERGY |
24,634 MMBtu 16,162 MMBtu |
$ 41,705 $ 28,480 |
10.71 % 7.31 % |
$ 4.36 /MMBtu |
Other Liquid (non-haz) |
40,500 Gal 0 Gal |
$ 14,690 $ 0 |
24.93 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
570,000 lbs 570,000 lbs |
$ 64,585 $ 63,770 |
13.55 % 13.38 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
MODIFY CURRENT INCENTIVE PROGRAM | 4.4210 | N | $ 10,000 | $ 105,000 | 0.10 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REDUCE SCRAP PRODUCTION | 3.1192 | I | $ 9,000 | $ 62,970 | 0.14 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE THIRD SHIFT | 2.6225 | I | $ 4,000 | $ 20,340 | 0.20 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | 3.4156 | N | $ 0 | $ 6,580 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | 2.6242 | N | $ 3,775 | $ 9,100 | 0.41 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | 3.6192 | N | $ 6,000 | $ 8,925 | 0.67 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 410 | $ 3,140 | 0.13 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
USE POWER FACTOR CONTROLLERS | 2.3211 | I | $ 5,675 | $ 2,500 | 2.27 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 2,590 | $ 1,360 | 1.90 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | N | $ 535 | $ 985 | 0.54 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||