Industrial Assessment Centers
Assessment #TN0586
| Assessment Year | 1996 |
|---|---|
| SIC | 3714 |
| SIC Description | Motor Vehicle Parts And Accessories |
| NAICS | |
| NAICS Description | |
| Principal Product | Automobile shock absorbers and suspension struts |
| Sales | $ 150,000,000 |
| # of Employees | 825 |
| Plant Area (Sq.Ft.) | 500,000 |
| Annual Production | 15,000,000 Pieces |
| Production Hrs. Annual | 7,200 |
| Location (State) | TN |
| Yearly Energy Cost | $ 2,541,770 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
42,452,521 kWh | $ 1,654,761 | $ 0.039 /kWh |
- Demand Charge |
93,529 kW | $ 358,513 | $ 3.83 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
131,819 MMBtu | $ 528,496 | $ 4.01 /MMBtu |
TOTAL ENERGY |
566,957 MMBtu | $ 2,541,770 | $ 4.48 /MMBtu |
Water Disposal |
174,980,000 Gal | $ 210,187 | $ 0 /Gal |
Other Liquid (non-haz) |
90,140 Gal | $ 44,500 | $ 0 /Gal |
Other Liquid (haz) |
1,400 Gal | $ 58,275 | $ 0 /Gal |
Solid Waste (non-haz) |
1,286,480 lbs | $ -4,116 | $ 0 /lbs |
Solid Waste (haz) |
328,000 lbs | $ 63,400 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,360,785 kWh 947,831 kWh |
$ 34,020 $ 23,700 |
2.06 % 1.43 % |
$ 0.039 /kWh |
- Demand Charge |
1,668 kW 1,560 kW |
$ 16,445 $ 15,380 |
4.59 % 4.29 % |
$ 3.83 /kW |
- Electricity Fees |
- |
$ 25,125 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
248 MMBtu 0 MMBtu |
$ 990 $ 0 |
0.19 % 0.00 % |
$ 4.01 /MMBtu |
TOTAL ENERGY |
14,195 MMBtu 9,715 MMBtu |
$ 76,580 $ 39,080 |
3.01 % 1.54 % |
$ 4.48 /MMBtu |
Water Disposal |
13,968,000 Gal 0 Gal |
$ 16,875 $ 0 |
8.03 % 0.00 % |
$ 0 /Gal |
Other Liquid (non-haz) |
72,080 Gal 0 Gal |
$ 35,450 $ 0 |
79.66 % 0.00 % |
$ 0 /Gal |
Other Liquid (haz) |
700 Gal 0 Gal |
$ 29,140 $ 0 |
50.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
367,500 lbs 367,500 lbs |
$ 2,740 $ 2,740 |
-66.57 % -66.57 % |
$ 0 /lbs |
Solid Waste (haz) |
104,960 lbs 0 lbs |
$ 20,290 $ 0 |
32.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | 3.1244 | N | $ 15,300 | $ 50,410 | 0.30 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 7,880 | $ 39,080 | 0.20 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 03 | view details |
USE EVAPORATION TO CONCENTRATE MATERIAL | 3.3131 | N | $ 30,600 | $ 32,200 | 0.95 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 04 | view details |
TREAT AND REUSE RINSE WATERS | 3.4113 | N | $ 66,740 | $ 29,935 | 2.23 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 05 | view details |
USE POWER FACTOR CONTROLLERS | 2.3211 | N | $ 60,800 | $ 25,125 | 2.42 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 7,350 | $ 7,800 | 0.94 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 07 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 29,600 | $ 7,400 | 4.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 08 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 4,400 | $ 3,650 | 1.21 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 09 | view details |
INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | 3.5313 | I | $ 0 | $ 4,410 | 0.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 10 | view details |
INSTALL / REPAIR INSULATION ON CONDENSATE LINES | 2.2122 | N | $ 260 | $ 340 | 0.76 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||