Industrial Assessment Centers
Assessment #TN0504
| Assessment Year | 1993 |
|---|---|
| SIC | 3432 |
| SIC Description | Plumbing Fixture Fittings And Trim |
| NAICS | |
| NAICS Description | |
| Principal Product | Plumbing fittings and faucets |
| Sales | $ 57,000,000 |
| # of Employees | 320 |
| Plant Area (Sq.Ft.) | 162,000 |
| Annual Production | 932,600 Pieces |
| Production Hrs. Annual | 6,000 |
| Location (State) | KY |
| Yearly Energy Cost | $ 433,079 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,830,891 kWh | $ 309,004 | $ 0.039 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
41,762 MMBtu | $ 124,075 | $ 2.97 /MMBtu |
TOTAL ENERGY |
122,029 MMBtu | $ 433,079 | $ 3.55 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,059,203 kWh 432,591 kWh |
$ 44,625 $ 17,302 |
14.44 % 5.60 % |
$ 0.039 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
5,621 MMBtu 5,621 MMBtu |
$ 16,143 $ 16,143 |
13.01 % 13.01 % |
$ 2.97 /MMBtu |
TOTAL ENERGY |
16,478 MMBtu 10,055 MMBtu |
$ 60,768 $ 33,445 |
14.03 % 7.72 % |
$ 3.55 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | I | $ 3,000 | $ 9,438 | 0.32 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 1,125 | $ 8,307 | 0.14 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL SPECTRAL REFLECTORS / DELAMP | 2.7144 | N | $ 45,191 | $ 15,927 | 2.84 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REPAIR AND ELIMINATE STEAM LEAKS | 2.2135 | I | $ 1,350 | $ 2,208 | 0.61 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 1,500 | $ 2,202 | 0.68 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 770 | $ 7,362 | 0.10 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE DEMAND CONTROLLER OR LOAD SHEDDER | 2.3191 | N | $ 9,600 | $ 7,140 | 1.34 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 3,700 | $ 2,626 | 1.41 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 1,416 | $ 2,227 | 0.64 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 1,856 | $ 1,383 | 1.34 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 375 | $ 318 | 1.18 | ||||||||||||||||
|
|||||||||||||||||||||||
| 12 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 610 | $ 1,196 | 0.51 | ||||||||||||||||
|
|||||||||||||||||||||||
| 13 | view details |
USE SYNTHETIC LUBRICANT | 2.4314 | N | $ 500 | $ 235 | 2.13 | ||||||||||||||||
|
|||||||||||||||||||||||
| 14 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | N | $ 330 | $ 199 | 1.66 | ||||||||||||||||
|
|||||||||||||||||||||||