Industrial Assessment Centers
Assessment #SU0320
| Assessment Year | 2012 |
|---|---|
| SIC | 3711 |
| SIC Description | Motor Vehicles And Car Bodies |
| NAICS | 336111 |
| NAICS Description | Automobile Manufacturing |
| Principal Product | Transit Buses |
| Sales | $ 221,124,062 |
| # of Employees | 497 |
| Plant Area (Sq.Ft.) | 309,500 |
| Annual Production | 463 Not Available |
| Production Hrs. Annual | 4,250 |
| Location (State) | NY |
| Yearly Energy Cost | $ 583,144 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
3,231,889 kWh | $ 190,404 | $ 0.059 /kWh |
- Demand Charge |
7,910 kW | $ 125,553 | $ 15.87 /kW |
- Electricity Fees |
- | $ 9,890 | - |
Natural Gas |
27,466 MMBtu | $ 257,297 | $ 9.37 /MMBtu |
TOTAL ENERGY |
60,593 MMBtu | $ 583,144 | $ 9.62 /MMBtu |
Water Disposal |
8,178,978 Gal | $ 62,412 | $ 0 /Gal |
Solid Waste (non-haz) |
229 lbs | $ 20,394 | $ 89 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
71,850 kWh 0 kWh |
$ 2,543 $ 0 |
1.34 % 0.00 % |
$ 0.059 /kWh |
- Demand Charge |
-337 kW 0 kW |
$ -5,146 $ 0 |
-4.10 % 0.00 % |
$ 15.87 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
3,118 MMBtu 0 MMBtu |
$ 29,299 $ 0 |
11.39 % 0.00 % |
$ 9.37 /MMBtu |
TOTAL ENERGY |
3,854 MMBtu 0 MMBtu |
$ 26,696 $ 0 |
4.58 % 0.00 % |
$ 9.62 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 89 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | 2.7221 | N | $ 0 | $ 1,185 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
REDUCE VENTILATION AIR | 2.7314 | N | $ 5,019 | $ 7,403 | 0.68 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | N | $ 42,038 | $ 18,749 | 2.24 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | 2.6211 | N | $ 1,332 | $ 391 | 3.41 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 37,046 | $ 10,671 | 3.47 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
MAKE A NEW BY-PRODUCT | 3.1182 | N | $ 100,000 | $ 21,685 | 4.61 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE/REDUCE AN OPERATION | 3.1161 | N | $ 15,840 | $ 2,644 | 5.99 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||