Industrial Assessment Centers
Assessment #SU0294
| Assessment Year | 2010 |
|---|---|
| SIC | 3724 |
| SIC Description | Aircraft Engines And Engine Parts |
| NAICS | 336412 |
| NAICS Description | Aircraft Engine and Engine Parts Manufacturing |
| Principal Product | Turbine Blades/Vanes |
| Sales | $ 30,421,619 |
| # of Employees | 110 |
| Plant Area (Sq.Ft.) | 115,000 |
| Annual Production | 1,000,000 Not Available |
| Production Hrs. Annual | 6,240 |
| Location (State) | NY |
| Yearly Energy Cost | $ 406,869 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
3,815,894 kWh | $ 220,017 | $ 0.058 /kWh |
- Demand Charge |
10,513 kW | $ 81,994 | $ 7.80 /kW |
- Electricity Fees |
- | $ 5,645 | - |
Natural Gas |
7,307 MMBtu | $ 99,213 | $ 13.58 /MMBtu |
TOTAL ENERGY |
46,420 MMBtu | $ 406,869 | $ 8.76 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
428,083 kWh 266,056 kWh |
$ 20,496 $ 12,713 |
9.32 % 5.78 % |
$ 0.058 /kWh |
- Demand Charge |
116 kW 116 kW |
$ 894 $ 894 |
1.09 % 1.09 % |
$ 7.80 /kW |
- Electricity Fees |
- |
$ 1,808 $ 0 |
32.03 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 13.58 /MMBtu |
TOTAL ENERGY |
4,389 MMBtu 2,728 MMBtu |
$ 23,198 $ 13,607 |
5.70 % 3.34 % |
$ 8.76 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 6,067 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 0 | $ 3,276 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 1,245 | $ 3,995 | 0.31 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,440 | $ 3,763 | 0.38 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 492 | $ 267 | 1.84 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 817 | $ 142 | 5.75 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
OPTIMIZE PLANT POWER FACTOR | 2.3212 | N | $ 9,734 | $ 1,808 | 5.38 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 17,732 | $ 3,680 | 4.82 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | 2.6211 | N | $ 516 | $ 108 | 4.78 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
UPGRADE OBSOLETE EQUIPMENT | 2.4321 | I | $ 1,831 | $ 276 | 6.63 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||