Industrial Assessment Centers
Assessment #SU0293
| Assessment Year | 2010 |
|---|---|
| SIC | 3546 |
| SIC Description | Power-driven Handtools |
| NAICS | 333991 |
| NAICS Description | Power-Driven Handtool Manufacturing |
| Principal Product | Compressed Air Tools |
| Sales | $ 108,086,202 |
| # of Employees | 140 |
| Plant Area (Sq.Ft.) | 420,000 |
| Annual Production | 6,000,000 Pieces |
| Production Hrs. Annual | 4,420 |
| Location (State) | PA |
| Yearly Energy Cost | $ 978,351 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
8,738,028 kWh | $ 413,468 | $ 0.047 /kWh |
- Demand Charge |
19,612 kW | $ 128,064 | $ 6.53 /kW |
- Electricity Fees |
- | $ 16,825 | - |
Natural Gas |
34,662 MMBtu | $ 419,994 | $ 12.12 /MMBtu |
TOTAL ENERGY |
124,228 MMBtu | $ 978,351 | $ 7.88 /MMBtu |
Water Disposal |
1,000,000 Gal | $ 12,000 | $ 0 /Gal |
Solid Waste (non-haz) |
10,000 lbs | $ 16,800 | $ 2 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,648,873 kWh 0 kWh |
$ 77,500 $ 0 |
18.74 % 0.00 % |
$ 0.047 /kWh |
- Demand Charge |
4,305 kW 0 kW |
$ 28,120 $ 0 |
21.96 % 0.00 % |
$ 6.53 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
-3,619 MMBtu 0 MMBtu |
$ -43,868 $ 0 |
-10.44 % 0.00 % |
$ 12.12 /MMBtu |
TOTAL ENERGY |
13,282 MMBtu 0 MMBtu |
$ 61,752 $ 0 |
6.31 % 0.00 % |
$ 7.88 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 2 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 0 | $ 17,252 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 0 | $ 3,692 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
USE SYNTHETIC LUBRICANT | 2.4314 | N | $ 0 | $ 3,669 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 2,942 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
PAY BILLS ON TIME TO AVOID LATE FEES | 4.8210 | N | $ 0 | $ 2,435 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 0 | $ 3,028 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 0 | $ 2,954 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 291 | $ 270 | 1.08 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | 2.6211 | N | $ 898 | $ 337 | 2.66 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 2,721 | $ 609 | 4.47 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 150,000 | $ 24,796 | 6.05 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
UPGRADE OBSOLETE EQUIPMENT | 2.4321 | N | $ 19,090 | $ 2,203 | 8.67 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||