Industrial Assessment Centers
Assessment #SU0267
| Assessment Year | 2008 |
|---|---|
| SIC | 3679 |
| SIC Description | Electronic Components, Nec |
| NAICS | 335999 |
| NAICS Description | All Other Miscellaneous Electrical Equipment and Component Manufacturing |
| Principal Product | Solenoids, Valves and LVDTs |
| Sales | $ 80,000,000 |
| # of Employees | 420 |
| Plant Area (Sq.Ft.) | 324,284 |
| Annual Production | 3,000,000 Pieces |
| Production Hrs. Annual | 5,746 |
| Location (State) | NY |
| Yearly Energy Cost | $ 1,160,511 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
11,211,055 kWh | $ 884,665 | $ 0.079 /kWh |
- Demand Charge |
27,590 kW | $ 5,518 | $ 0.20 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
24,762 MMBtu | $ 270,328 | $ 10.92 /MMBtu |
TOTAL ENERGY |
139,675 MMBtu | $ 1,160,511 | $ 8.31 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
397,071 kWh 296,086 kWh |
$ 31,368 $ 23,390 |
3.55 % 2.64 % |
$ 0.079 /kWh |
- Demand Charge |
1,196 kW 584 kW |
$ 238 $ 116 |
4.31 % 2.10 % |
$ 0.20 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 10.92 /MMBtu |
TOTAL ENERGY |
4,070 MMBtu 3,035 MMBtu |
$ 31,606 $ 23,506 |
2.72 % 2.03 % |
$ 8.31 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | N | $ 0 | $ 7,704 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 664 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 0 | $ 730 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
DISCONNECT BALLASTS | 2.7122 | N | $ 0 | $ 209 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
USE SYNTHETIC LUBRICANT | 2.4314 | N | $ 0 | $ 187 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
DISCONNECT BALLASTS | 2.7122 | I | $ 77 | $ 3,272 | 0.02 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,031 | $ 6,466 | 0.16 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 486 | $ 2,367 | 0.21 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 2,060 | $ 5,959 | 0.35 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | 3.1191 | N | $ 23,800 | $ 46,739 | 0.51 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
RECOVER AND REUSE SPENT ACID BATHS | 3.5145 | N | $ 2,062 | $ 1,453 | 1.42 | ||||||||||||||||
|
|||||||||||||||||||||||
| 12 | view details |
CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | 2.6211 | I | $ 353 | $ 185 | 1.91 | ||||||||||||||||
|
|||||||||||||||||||||||
| 13 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 9,244 | $ 3,863 | 2.39 | ||||||||||||||||
|
|||||||||||||||||||||||