Industrial Assessment Centers
Assessment #SU0201
| Assessment Year | 2005 |
|---|---|
| SIC | 2879 |
| SIC Description | Agricultural Chemicals, Nec |
| NAICS | 325320 |
| NAICS Description | Pesticide and Other Agricultural Chemical Manufacturing |
| Principal Product | Small Package Pesticides |
| Sales | $ 25,000,000 |
| # of Employees | 140 |
| Plant Area (Sq.Ft.) | 220,000 |
| Annual Production | 500,000 Pieces |
| Production Hrs. Annual | 2,210 |
| Location (State) | NY |
| Yearly Energy Cost | $ 203,196 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,111,745 kWh | $ 91,809 | $ 0.083 /kWh |
- Demand Charge |
4,102 kW | $ 61,413 | $ 14.97 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
6,072 MMBtu | $ 49,974 | $ 8.23 /MMBtu |
TOTAL ENERGY |
17,467 MMBtu | $ 203,196 | $ 11.63 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
156,680 kWh 80,498 kWh |
$ 13,003 $ 6,680 |
14.16 % 7.28 % |
$ 0.083 /kWh |
- Demand Charge |
564 kW 139 kW |
$ 8,444 $ 2,082 |
13.75 % 3.39 % |
$ 14.97 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 8.23 /MMBtu |
TOTAL ENERGY |
1,606 MMBtu 825 MMBtu |
$ 21,447 $ 8,762 |
10.55 % 4.31 % |
$ 11.63 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 2,721 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 142 | $ 2,094 | 0.07 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 617 | $ 1,555 | 0.40 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 461 | $ 673 | 0.68 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 3,211 | $ 4,182 | 0.77 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 20,054 | $ 10,591 | 1.89 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||