Industrial Assessment Centers
Assessment #SF0356
| Assessment Year | 2008 |
|---|---|
| SIC | 2084 |
| SIC Description | Wines, Brandy, And Brandy Spirits |
| NAICS | 312130 |
| NAICS Description | Wineries |
| Principal Product | Bottled Wine |
| Sales | $ 200,000,000 |
| # of Employees | 241 |
| Plant Area (Sq.Ft.) | 230,000 |
| Annual Production | 2,000,000 Pieces |
| Production Hrs. Annual | 4,020 |
| Location (State) | CA |
| Yearly Energy Cost | $ 719,507 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
16,890 kWh | $ 401,548 | $ 23.774 /kWh |
- Demand Charge |
11,671 kW | $ 153,417 | $ 13.15 /kW |
- Electricity Fees |
- | $ 13,195 | - |
Natural Gas |
15,169 MMBtu | $ 151,347 | $ 9.98 /MMBtu |
TOTAL ENERGY |
15,342 MMBtu | $ 719,507 | $ 46.90 /MMBtu |
Solid Waste (non-haz) |
128,000 lbs | $ 13,455 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
817,923 kWh 692,593 kWh |
$ 74,578 $ 57,101 |
18.57 % 14.22 % |
$ 23.774 /kWh |
- Demand Charge |
1,843 kW 1,560 kW |
$ 19,711 $ 16,991 |
12.85 % 11.08 % |
$ 13.15 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
244 MMBtu 0 MMBtu |
$ 2,504 $ 0 |
1.65 % 0.00 % |
$ 9.98 /MMBtu |
TOTAL ENERGY |
8,629 MMBtu 7,100 MMBtu |
$ 96,793 $ 74,092 |
13.45 % 10.30 % |
$ 46.90 /MMBtu |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 150 | $ 5,321 | 0.03 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
MAKE ICE DURING OFF PEAK HOURS FOR COOLING | 2.3113 | N | $ 0 | $ 41,503 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 6,281 | $ 6,655 | 0.94 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 3,760 | $ 2,504 | 1.50 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | 2.7212 | I | $ 26,898 | $ 17,740 | 1.52 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 80,535 | $ 37,472 | 2.15 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | N | $ 10,979 | $ 4,534 | 2.42 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | 3.4111 | N | $ 4,549 | $ 1,532 | 2.97 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 40,545 | $ 12,225 | 3.32 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | N | $ 36,311 | $ 8,810 | 4.12 | ||||||||||||||||
|
|||||||||||||||||||||||