Industrial Assessment Centers
Assessment #SF0349
| Assessment Year | 2007 |
|---|---|
| SIC | 3339 |
| SIC Description | Primary Nonferrous Metals, Nec |
| NAICS | 331419 |
| NAICS Description | Primary Smelting and Refining of Nonferrous Metal (except Copper and Aluminum) |
| Principal Product | Investment Castings |
| Sales | $ 42,000,000 |
| # of Employees | 250 |
| Plant Area (Sq.Ft.) | 55,000 |
| Annual Production | 200,000 Pieces |
| Production Hrs. Annual | 8,736 |
| Location (State) | NV |
| Yearly Energy Cost | $ 1,004,385 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,664,240 kWh | $ 496,733 | $ 0.088 /kWh |
- Demand Charge |
15,372 kW | $ 166,986 | $ 10.86 /kW |
- Electricity Fees |
- | $ 39,414 | - |
Natural Gas |
25,304 MMBtu | $ 301,252 | $ 11.91 /MMBtu |
TOTAL ENERGY |
83,362 MMBtu | $ 1,004,385 | $ 12.05 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
784,334 kWh 130,507 kWh |
$ 64,645 $ 11,088 |
13.01 % 2.23 % |
$ 0.088 /kWh |
- Demand Charge |
471 kW 161 kW |
$ 5,093 $ 1,738 |
3.05 % 1.04 % |
$ 10.86 /kW |
- Electricity Fees |
- |
$ 8,751 $ 0 |
22.20 % 0.00 % |
- |
Natural Gas |
2,845 MMBtu 588 MMBtu |
$ 33,739 $ 6,853 |
11.20 % 2.27 % |
$ 11.91 /MMBtu |
TOTAL ENERGY |
10,884 MMBtu 1,925 MMBtu |
$ 112,228 $ 19,679 |
11.17 % 1.96 % |
$ 12.05 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPAIR LEAKS IN LINES AND VALVES | 2.2133 | I | $ 0 | $ 6,853 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 150 | $ 6,603 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 1,755 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 10,019 | $ 19,139 | 0.52 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 1,992 | $ 3,490 | 0.57 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | I | $ 757 | $ 725 | 1.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 8,646 | $ 7,644 | 1.13 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 2,339 | $ 2,042 | 1.15 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
COVER OPEN TANKS | 2.2514 | N | $ 14,940 | $ 12,984 | 1.15 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 4,281 | $ 3,554 | 1.20 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 52,080 | $ 31,597 | 1.65 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
USE PHOTOCELL CONTROLS | 2.7134 | I | $ 9,569 | $ 3,302 | 2.90 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 980 | $ 335 | 2.93 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 14 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 11,000 | $ 3,454 | 3.18 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 15 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 37,915 | $ 8,751 | 4.33 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||