Industrial Assessment Centers
Assessment #SF0337
| Assessment Year | 2007 |
|---|---|
| SIC | 2835 |
| SIC Description | Diagnostic Substances |
| NAICS | 325412 |
| NAICS Description | Pharmaceutical Preparation Manufacturing |
| Principal Product | Drugs of Abuse Test Kits |
| Sales | $ 80,000,000 |
| # of Employees | 270 |
| Plant Area (Sq.Ft.) | 90,000 |
| Annual Production | 45,000,000 Pieces |
| Production Hrs. Annual | 2,340 |
| Location (State) | CA |
| Yearly Energy Cost | $ 301,124 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,208,699 kWh | $ 210,970 | $ 0.096 /kWh |
- Demand Charge |
6,546 kW | $ 90,154 | $ 13.77 /kW |
- Electricity Fees |
- | $ 0 | - |
TOTAL ENERGY |
22,639 MMBtu | $ 301,124 | $ 13.30 /MMBtu |
Other Liquid (haz) |
15,900 Gal | $ 20,928 | $ 1 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
220,247 kWh 119,011 kWh |
$ 24,839 $ 13,458 |
11.77 % 6.38 % |
$ 0.096 /kWh |
- Demand Charge |
2,227 kW 134 kW |
$ 42,438 $ 2,572 |
47.07 % 2.85 % |
$ 13.77 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
TOTAL ENERGY |
2,388 MMBtu 1,351 MMBtu |
$ 69,006 $ 17,759 |
22.92 % 5.90 % |
$ 13.30 /MMBtu |
Other Liquid (haz) |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 1 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 0 | $ 9,667 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 20,000 | $ 50,318 | 0.40 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 937 | $ 1,729 | 0.54 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 3,344 | $ 3,650 | 0.92 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 3,510 | $ 1,534 | 2.29 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | I | $ 3,376 | $ 1,179 | 2.86 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 3,460 | $ 929 | 3.72 | ||||||||||||||||
|
|||||||||||||||||||||||