Industrial Assessment Centers
Assessment #SF0277
| Assessment Year | 2004 |
|---|---|
| SIC | 3264 |
| SIC Description | Porcelain Electrical Supplies |
| NAICS | 327113 |
| NAICS Description | Porcelain Electrical Supply Manufacturing |
| Principal Product | Technical Ceramics |
| Sales | $ 20,000,000 |
| # of Employees | 139 |
| Plant Area (Sq.Ft.) | 270,000 |
| Annual Production | 0 Pieces |
| Production Hrs. Annual | 8,736 |
| Location (State) | CA |
| Yearly Energy Cost | $ 1,589,321 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
9,192,745 kWh | $ 925,820 | $ 0.101 /kWh |
- Demand Charge |
20,806 kW | $ 221,776 | $ 10.66 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
60,324 MMBtu | $ 441,725 | $ 7.32 /MMBtu |
TOTAL ENERGY |
154,550 MMBtu | $ 1,589,321 | $ 10.28 /MMBtu |
Other Liquid (haz) |
660 Gal | $ 1,062 | $ 0 /Gal |
Solid Waste (non-haz) |
1,950 lbs | $ 23,283 | $ 0 /lbs |
Solid Waste (haz) |
156 lbs | $ 1,284 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,197,647 kWh 592,317 kWh |
$ 124,056 $ 59,645 |
13.40 % 6.44 % |
$ 0.101 /kWh |
- Demand Charge |
1,376 kW 200 kW |
$ 16,711 $ 2,130 |
7.54 % 0.96 % |
$ 10.66 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 7.32 /MMBtu |
TOTAL ENERGY |
12,276 MMBtu 6,071 MMBtu |
$ 140,767 $ 61,775 |
8.86 % 3.89 % |
$ 10.28 /MMBtu |
Other Liquid (haz) |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 5,568 $ 0 |
23.91 % 0.00 % |
$ 0 /lbs |
Solid Waste (haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | I | $ 0 | $ 38,710 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 9,221 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
TURN OFF EQUIPMENT WHEN NOT IN USE | 2.6218 | I | $ 720 | $ 2,460 | 0.29 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
TURN OFF EQUIPMENT WHEN NOT IN USE | 2.6218 | N | $ 240 | $ 954 | 0.25 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
TURN OFF EQUIPMENT WHEN NOT IN USE | 2.6218 | I | $ 240 | $ 784 | 0.31 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 5,882 | $ 16,226 | 0.36 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 16,011 | $ 13,431 | 1.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 13,520 | $ 10,600 | 1.28 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 3,072 | $ 1,907 | 1.61 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 41,948 | $ 21,365 | 1.96 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 29,053 | $ 10,871 | 2.67 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 32,344 | $ 7,600 | 4.26 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | 3.6193 | N | $ 18,000 | $ 5,568 | 3.23 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 14 | view details |
CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | 4.2110 | N | $ 0 | $ 7,239 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 15 | view details |
CHANGE OPERATING CONDITIONS | 4.6320 | N | $ 0 | $ 5,549 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 16 | view details |
USE POWER FACTOR CONTROLLERS | 2.3211 | N | $ 5,667 | $ 3,454 | 1.64 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||