| Assessment Year | 2001 |
|---|---|
| SIC | 3819 |
| SIC Description | |
| NAICS | |
| NAICS Description | |
| Principal Product | Catalyst Pellets |
| Sales | $ 62,000,000 |
| # of Employees | 80 |
| Plant Area (Sq.Ft.) | 1,350,360 |
| Annual Production | 45,700,000 Pounds |
| Production Hrs. Annual | 8,736 |
| Location (State) | CA |
| Yearly Energy Cost | $ 2,393,263 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
16,537,220 kWh | $ 813,683 | $ 0.049 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
282,907 MMBtu | $ 1,579,580 | $ 5.58 /MMBtu |
TOTAL ENERGY |
452,414 MMBtu | $ 2,393,263 | $ 5.29 /MMBtu |
Solid Waste (non-haz) |
3,160 lbs | $ 26,931 | $ 0 /lbs |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
4,293,584 kWh 2,508,529 kWh |
$ 124,046 $ 68,844 |
15.25 % 8.46 % |
$ 0.049 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 5.58 /MMBtu |
TOTAL ENERGY |
44,008 MMBtu 25,711 MMBtu |
$ 124,046 $ 68,844 |
5.18 % 2.88 % |
$ 5.29 /MMBtu |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 827,584 $ 224,124 |
3,072.98 % 832.22 % |
$ 0 /lbs |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
APPLY A PROTECTIVE COATING TO RACKS AND TANKS | 3.7392 | I | $ 0 | $ 3,452 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | I | $ 4,574 | $ 9,984 | 0.46 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 1,366 | $ 1,711 | 0.80 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | 2.7132 | N | $ 13,500 | $ 12,982 | 1.04 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | I | $ 50,000 | $ 46,103 | 1.08 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 3,291 | $ 2,758 | 1.19 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 14,341 | $ 6,547 | 2.19 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | 2.7132 | P | $ 14,760 | $ 5,806 | 2.54 | ||||||||||||
|
|||||||||||||||||||
| 09 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 3,400 | $ 1,329 | 2.56 | ||||||||||||
|
|||||||||||||||||||
| 10 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | P | $ 128,000 | $ 33,374 | 3.84 | ||||||||||||
|
|||||||||||||||||||
| 11 | view details |
USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | 3.6192 | I | $ 0 | $ 219,121 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 12 | view details |
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | 3.6193 | N | $ 0 | $ 3,216 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 13 | view details |
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | 3.6193 | P | $ 60,000 | $ 461,186 | 0.13 | ||||||||||||
|
|||||||||||||||||||
| 14 | view details |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | 4.1110 | P | $ 35,200 | $ 139,058 | 0.25 | ||||||||||||
|
|||||||||||||||||||
| 15 | view details |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | 4.1110 | I | $ 5,111 | $ 5,003 | 1.02 | ||||||||||||
|
|||||||||||||||||||