Industrial Assessment Centers
Assessment #SF0118
| Assessment Year | 1997 |
|---|---|
| SIC | 2952 |
| SIC Description | Asphalt Felts And Coatings |
| NAICS | |
| NAICS Description | |
| Principal Product | Roofing Rolls |
| Sales | $ 20,000,000 |
| # of Employees | 60 |
| Plant Area (Sq.Ft.) | 45,000 |
| Annual Production | 900,000 Pieces |
| Production Hrs. Annual | 6,000 |
| Location (State) | CA |
| Yearly Energy Cost | $ 401,848 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
3,011,137 kWh | $ 171,009 | $ 0.057 /kWh |
- Demand Charge |
7,983 kW | $ 103,060 | $ 12.91 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
45,723 MMBtu | $ 127,779 | $ 2.79 /MMBtu |
TOTAL ENERGY |
76,587 MMBtu | $ 401,848 | $ 5.25 /MMBtu |
Other Liquid (haz) |
385 Gal | $ 2,800 | $ 0 /Gal |
Solid Waste (non-haz) |
321,481 lbs | $ 67,299 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
293,377 kWh 293,377 kWh |
$ 13,246 $ 13,246 |
7.75 % 7.75 % |
$ 0.057 /kWh |
- Demand Charge |
231 kW 231 kW |
$ 2,986 $ 2,986 |
2.90 % 2.90 % |
$ 12.91 /kW |
- Electricity Fees |
- |
$ 32,638 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 2.79 /MMBtu |
TOTAL ENERGY |
3,006 MMBtu 3,006 MMBtu |
$ 48,870 $ 16,232 |
12.16 % 4.04 % |
$ 5.25 /MMBtu |
Other Liquid (haz) |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
1,263,508 lbs 1,263,508 lbs |
$ 51,806 $ 51,806 |
76.98 % 76.98 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 2,700 | $ 2,575 | 1.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
USE PHOTOCELL CONTROLS | 2.7134 | I | $ 2,000 | $ 3,456 | 0.58 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 1,356 | $ 1,464 | 0.93 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
OPTIMIZE PLANT POWER FACTOR | 2.3212 | N | $ 2,409 | $ 1,631 | 1.48 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 140,000 | $ 31,007 | 4.52 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | I | $ 365 | $ 369 | 0.99 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 14,926 | $ 4,770 | 3.13 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 14,138 | $ 3,598 | 3.93 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
CONTRACT A WOOD PALLET RECYCLING COMPANY | 3.5316 | I | $ 250 | $ 499 | 0.50 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | 3.2111 | I | $ 500 | $ 4,583 | 0.11 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | 4.1220 | I | $ 32,060 | $ 46,724 | 0.69 | ||||||||||||||||
|
|||||||||||||||||||||||