Industrial Assessment Centers
Assessment #SD0452
| Assessment Year | 2012 |
|---|---|
| SIC | 4952 |
| SIC Description | Sewerage Systems |
| NAICS | 221310 |
| NAICS Description | Water Supply and Irrigation Systems |
| Principal Product | Treated Water |
| Sales | $ 10,000,000 |
| # of Employees | 13 |
| Plant Area (Sq.Ft.) | 2,560,000 |
| Annual Production | 11,500 Thousand Gallons |
| Production Hrs. Annual | 8,760 |
| Location (State) | CA |
| Yearly Energy Cost | $ 1,703,133 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
11,979,368 kWh | $ 1,045,469 | $ 0.087 /kWh |
- Demand Charge |
25,575 kW | $ 388,588 | $ 15.19 /kW |
- Electricity Fees |
- | $ 11,590 | - |
Natural Gas |
46,277 MMBtu | $ 257,486 | $ 5.56 /MMBtu |
TOTAL ENERGY |
169,067 MMBtu | $ 1,703,133 | $ 10.07 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,062,689 kWh 969,585 kWh |
$ 92,773 $ 84,645 |
8.87 % 8.10 % |
$ 0.087 /kWh |
- Demand Charge |
1,509 kW 1,381 kW |
$ 22,922 $ 20,977 |
5.90 % 5.40 % |
$ 15.19 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
14,338 MMBtu 14,338 MMBtu |
$ 79,775 $ 79,775 |
30.98 % 30.98 % |
$ 5.56 /MMBtu |
TOTAL ENERGY |
25,230 MMBtu 24,276 MMBtu |
$ 195,469 $ 185,397 |
11.48 % 10.89 % |
$ 10.07 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | 2.1336 | I | $ 2,000 | $ 48,619 | 0.04 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | I | $ 15,925 | $ 24,957 | 0.64 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | 3.1191 | N | $ 18,680 | $ 10,072 | 1.85 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | I | $ 4,200 | $ 2,223 | 1.89 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | 2.3415 | I | $ 275,000 | $ 102,098 | 2.69 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||