Industrial Assessment Centers
Assessment #SD0270
| Assessment Year | 2001 |
|---|---|
| SIC | 3053 |
| SIC Description | Gaskets, Packing And Sealing Devices |
| NAICS | |
| NAICS Description | |
| Principal Product | rubber o-rings |
| Sales | $ 35,000,000 |
| # of Employees | 650 |
| Plant Area (Sq.Ft.) | 200,000 |
| Annual Production | 1,500,000 Pounds |
| Production Hrs. Annual | 7,200 |
| Location (State) | CA |
| Yearly Energy Cost | $ 1,127,534 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
15,392,861 kWh | $ 783,886 | $ 0.051 /kWh |
- Demand Charge |
32,021 kW | $ 326,400 | $ 10.19 /kW |
- Electricity Fees |
- | $ 4,308 | - |
Natural Gas |
4,702 MMBtu | $ 12,940 | $ 2.75 /MMBtu |
TOTAL ENERGY |
162,479 MMBtu | $ 1,127,534 | $ 6.94 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
19,730,027 kWh 3,331,307 kWh |
$ 1,006,131 $ 169,896 |
128.35 % 21.67 % |
$ 0.051 /kWh |
- Demand Charge |
35,016 kW 6,648 kW |
$ 355,902 $ 66,833 |
109.04 % 20.48 % |
$ 10.19 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
-312,031 MMBtu 0 MMBtu |
$ -749,639 $ 0 |
-5,793.19 % 0.00 % |
$ 2.75 /MMBtu |
TOTAL ENERGY |
-109,800 MMBtu 34,145 MMBtu |
$ 612,394 $ 236,729 |
54.31 % 21.00 % |
$ 6.94 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDESIGN PROCESS | 2.5194 | I | $ 35,000 | $ 182,520 | 0.19 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | 2.2614 | I | $ 15,000 | $ 21,642 | 0.69 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 800 | $ 23,189 | 0.03 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 90,000 | $ 63,100 | 1.43 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET | 2.4142 | I | $ 36,000 | $ 27,077 | 1.33 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET | 2.4142 | I | $ 103,000 | $ 51,823 | 1.99 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
INSTALL SKYLIGHTS | 2.7145 | I | $ 12,500 | $ 7,878 | 1.59 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | 2.3416 | N | $ 3,037,200 | $ 983,363 | 3.09 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 09 | view details |
SALVAGE AND RE-USE PROCESS WASTE | 3.5312 | I | $ 5,000 | $ 32,522 | 0.15 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 10 | view details |
MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | 3.4131 | I | $ 1,500 | $ 3,170 | 0.47 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 11 | view details |
USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | 3.8132 | I | $ 0 | $ 648 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 12 | view details |
INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | 3.6193 | I | $ 15,000 | $ 25,910 | 0.58 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 13 | view details |
REUSE / RECYCLE/ SELL RUBBER PRODUCTS | 3.5218 | I | $ 0 | $ 35,880 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 14 | view details |
PAY BILLS ON TIME TO AVOID LATE FEES | 4.8210 | N | $ 0 | $ 1,393 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 15 | view details |
IMPROVE SPACE COMFORT CONDITIONING | 4.4240 | N | $ 30,000 | $ 65,375 | 0.46 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 16 | view details |
CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | 4.2110 | N | $ 30,000 | $ 21,296 | 1.41 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||