Assessment #SD0076
| Assessment Year | 1994 |
|---|---|
| SIC | 2835 |
| SIC Description | Diagnostic Substances |
| NAICS | |
| NAICS Description | |
| Principal Product | Medical Diagnostic Equip. |
| Sales | $ 80,000,000 |
| # of Employees | 400 |
| Plant Area (Sq.Ft.) | 242,000 |
| Annual Production | 500,000 Pieces |
| Production Hrs. Annual | 4,080 |
| Location (State) | CA |
| Yearly Energy Cost | $ 1,078,362 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
11,866,647 kWh | $ 913,690 | $ 0.077 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
32,799 MMBtu | $ 164,672 | $ 5.02 /MMBtu |
TOTAL ENERGY |
154,432 MMBtu | $ 1,078,362 | $ 6.98 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
152,990 kWh 152,990 kWh |
$ 12,644 $ 12,644 |
1.38 % 1.38 % |
$ 0.077 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
2,949 MMBtu 1,392 MMBtu |
$ 11,108 $ 3,294 |
6.75 % 2.00 % |
$ 5.02 /MMBtu |
TOTAL ENERGY |
4,516 MMBtu 2,959 MMBtu |
$ 23,752 $ 15,938 |
2.20 % 1.48 % |
$ 6.98 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 3,970 | $ 5,070 | 0.78 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 20 | $ 1,732 | 0.01 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 512 | $ 263 | 1.95 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | 2.1243 | N | $ 1,235 | $ 7,814 | 0.16 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | 2.2425 | I | $ 3,180 | $ 3,031 | 1.05 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 1,516 | $ 1,666 | 0.91 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
INSTALL SPECTRAL REFLECTORS / DELAMP | 2.7144 | I | $ 2,416 | $ 1,072 | 2.25 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | 2.7132 | I | $ 175 | $ 231 | 0.76 | ||||||||||||
|
|||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 552 | $ 457 | 1.21 | ||||||||||||
|
|||||||||||||||||||
| 10 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 3,760 | $ 1,267 | 2.97 | ||||||||||||
|
|||||||||||||||||||
| 11 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 630 | $ 1,149 | 0.55 | ||||||||||||
|
|||||||||||||||||||