Industrial Assessment Centers
Assessment #RU0089
| Assessment Year | 1990 |
|---|---|
| SIC | 3061 |
| SIC Description | Mechanical Rubber Goods |
| NAICS | |
| NAICS Description | |
| Principal Product | MOLDED RUBBER PRODUCTS |
| Sales | $ 3,500,000 |
| # of Employees | 80 |
| Plant Area (Sq.Ft.) | 0 |
| Annual Production | 16 Tons |
| Production Hrs. Annual | 4,000 |
| Location (State) | NY |
| Yearly Energy Cost | $ 150,062 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,038,980 kWh | $ 106,376 | $ 0.102 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
8,390 MMBtu | $ 43,686 | $ 5.21 /MMBtu |
TOTAL ENERGY |
19,040 MMBtu | $ 150,062 | $ 7.88 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
11,430 kWh 2,344 kWh |
$ 1,168 $ 237 |
1.10 % 0.22 % |
$ 0.102 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
806 MMBtu 741 MMBtu |
$ 21,099 $ 20,760 |
48.30 % 47.52 % |
$ 5.21 /MMBtu |
TOTAL ENERGY |
923 MMBtu 765 MMBtu |
$ 22,267 $ 20,997 |
14.84 % 13.99 % |
$ 7.88 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 500 | $ 2,307 | 0.22 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
INSTALL / REPAIR INSULATION ON CONDENSATE LINES | 2.2122 | N | $ 75 | $ 339 | 0.22 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | I | $ 5,000 | $ 16,780 | 0.30 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | I | $ 2,520 | $ 1,389 | 1.81 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 68 | $ 931 | 0.07 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 300 | $ 521 | 0.58 | ||||||||||||||||
|
|||||||||||||||||||||||