Industrial Assessment Centers
Assessment #RU0060
| Assessment Year | 1989 |
|---|---|
| SIC | 3272 |
| SIC Description | Concrete Products, Nec |
| NAICS | |
| NAICS Description | |
| Principal Product | PRESTRESSED CONCRETE |
| Sales | $ 25,000,000 |
| # of Employees | 175 |
| Plant Area (Sq.Ft.) | 0 |
| Annual Production | 200 Thousand Feet |
| Production Hrs. Annual | 5,049 |
| Location (State) | MD |
| Yearly Energy Cost | $ 521,984 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,149,473 kWh | $ 269,636 | $ 0.065 /kWh |
- Electricity Fees |
- | $ 0 | - |
Fuel Oil #4 |
83,805 MMBtu | $ 252,348 | $ 3.01 /MMBtu |
TOTAL ENERGY |
126,337 MMBtu | $ 521,984 | $ 4.13 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
252,931 kWh 252,931 kWh |
$ 16,436 $ 16,436 |
6.10 % 6.10 % |
$ 0.065 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #4 |
17,631 MMBtu 15,686 MMBtu |
$ 53,073 $ 47,217 |
21.03 % 18.71 % |
$ 3.01 /MMBtu |
TOTAL ENERGY |
20,223 MMBtu 18,278 MMBtu |
$ 69,509 $ 63,653 |
13.32 % 12.19 % |
$ 4.13 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPAIR LEAKS IN LINES AND VALVES | 2.2133 | I | $ 0 | $ 20,786 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | 2.5121 | I | $ 16,835 | $ 18,359 | 0.92 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | N | $ 6,900 | $ 5,856 | 1.18 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 11,256 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 102 | $ 5,180 | 0.02 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 1,500 | $ 8,072 | 0.19 | ||||||||||||
|
|||||||||||||||||||