Industrial Assessment Centers
Assessment #OR0558
| Assessment Year | 2010 |
|---|---|
| SIC | 2037 |
| SIC Description | Frozen Fruits And Vegetables |
| NAICS | 311411 |
| NAICS Description | Frozen Fruit, Juice, and Vegetable Manufacturing |
| Principal Product | Bean, Corn, and Squash |
| Sales | $ 200,000,000 |
| # of Employees | 150 |
| Plant Area (Sq.Ft.) | 378,448 |
| Annual Production | 150,000,000 Not Available |
| Production Hrs. Annual | 8,424 |
| Location (State) | OR |
| Yearly Energy Cost | $ 1,107,433 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
18,283,680 kWh | $ 674,990 | $ 0.037 /kWh |
- Demand Charge |
44,171 kW | $ 292,150 | $ 6.61 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
25,103 MMBtu | $ 140,293 | $ 5.59 /MMBtu |
TOTAL ENERGY |
212,511 MMBtu | $ 1,107,433 | $ 5.21 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,075,535 kWh 536,531 kWh |
$ 46,418 $ 23,444 |
6.88 % 3.47 % |
$ 0.037 /kWh |
- Demand Charge |
97 kW 38 kW |
$ 6,147 $ 2,393 |
2.10 % 0.82 % |
$ 6.61 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 5.59 /MMBtu |
TOTAL ENERGY |
11,023 MMBtu 5,499 MMBtu |
$ 52,565 $ 25,837 |
4.75 % 2.33 % |
$ 5.21 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | 2.2621 | I | $ 2,965 | $ 6,602 | 0.45 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 7,102 | $ 7,102 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 4,935 | $ 1,319 | 3.74 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 120,911 | $ 14,738 | 8.20 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
USE SOLAR HEAT TO MAKE ELECTRICTY | 2.9114 | N | $ 379,829 | $ 25,798 | 14.72 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | 2.2621 | N | $ 1 | $ 930 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||