Industrial Assessment Centers
Assessment #OR0387
| Assessment Year | 2001 |
|---|---|
| SIC | 2092 |
| SIC Description | Fresh Or Frozen Prepared Fish |
| NAICS | |
| NAICS Description | |
| Principal Product | Artificial Crab/Surimi Seafood |
| Sales | $ 11,104,750 |
| # of Employees | 80 |
| Plant Area (Sq.Ft.) | 100,000 |
| Annual Production | 12,341,692 Pounds |
| Production Hrs. Annual | 4,824 |
| Location (State) | OR |
| Yearly Energy Cost | $ 284,361 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,556,300 kWh | $ 91,749 | $ 0.036 /kWh |
- Demand Charge |
64,224 kW | $ 21,466 | $ 0.33 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
25,110 MMBtu | $ 171,146 | $ 6.82 /MMBtu |
TOTAL ENERGY |
51,312 MMBtu | $ 284,361 | $ 5.54 /MMBtu |
Water Disposal |
9,488,527 Gal | $ 25,538 | $ 0 /Gal |
Solid Waste (non-haz) |
330,660 lbs | $ 17,676 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
-1,296,061 kWh 0 kWh |
$ -46,600 $ 0 |
-50.79 % 0.00 % |
$ 0.036 /kWh |
- Demand Charge |
-3,504 kW 0 kW |
$ -15,000 $ 0 |
-69.88 % 0.00 % |
$ 0.33 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
2,378 MMBtu 2,378 MMBtu |
$ 14,685 $ 14,685 |
8.58 % 8.58 % |
$ 6.82 /MMBtu |
TOTAL ENERGY |
-10,906 MMBtu 2,378 MMBtu |
$ -46,915 $ 14,685 |
-16.50 % 5.16 % |
$ 5.54 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
74,880 lbs 74,880 lbs |
$ 2,560 $ 2,560 |
14.48 % 14.48 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | 4.1110 | I | $ 5,000 | $ 176,000 | 0.03 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | 4.1110 | I | $ 128,700 | $ 440,800 | 0.29 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | 4.1130 | N | $ 138,000 | $ 324,800 | 0.42 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | N | $ 580,000 | $ 373,000 | 1.55 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | 4.3230 | I | $ 74,000 | $ 57,000 | 1.30 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | I | $ 5,850 | $ 12,800 | 0.46 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | 2.2621 | N | $ 5,400 | $ 3,400 | 1.59 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | 2.1231 | I | $ 300 | $ 1,885 | 0.16 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 09 | view details |
REUSE / RECYCLE/ SELL RUBBER PRODUCTS | 3.5218 | I | $ 0 | $ 2,320 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||