Industrial Assessment Centers
Assessment #OR0271
| Assessment Year | 1996 |
|---|---|
| SIC | 2037 |
| SIC Description | Frozen Fruits And Vegetables |
| NAICS | |
| NAICS Description | |
| Principal Product | fruit juice, concentrate, jelly |
| Sales | $ 84,000,000 |
| # of Employees | 160 |
| Plant Area (Sq.Ft.) | 212,000 |
| Annual Production | 14,000,000 Thousand Gallons |
| Production Hrs. Annual | 2,040 |
| Location (State) | WA |
| Yearly Energy Cost | $ 395,847 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
6,533,998 kWh | $ 162,887 | $ 0.025 /kWh |
- Demand Charge |
15,504 kW | $ 90,264 | $ 5.82 /kW |
- Electricity Fees |
- | $ 5,328 | - |
Natural Gas |
54,947 MMBtu | $ 137,368 | $ 2.50 /MMBtu |
TOTAL ENERGY |
121,920 MMBtu | $ 395,847 | $ 3.25 /MMBtu |
Water Disposal |
106,474,120 Gal | $ 217,697 | $ 0 /Gal |
Solid Waste (non-haz) |
105,000 lbs | $ 1,660 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,331,185 kWh 930,833 kWh |
$ 29,370 $ 20,530 |
18.03 % 12.60 % |
$ 0.025 /kWh |
- Demand Charge |
1,123 kW 1,191 kW |
$ 6,240 $ 6,620 |
6.91 % 7.33 % |
$ 5.82 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,418 MMBtu 0 MMBtu |
$ 11,040 $ 0 |
8.04 % 0.00 % |
$ 2.50 /MMBtu |
TOTAL ENERGY |
18,064 MMBtu 9,542 MMBtu |
$ 46,650 $ 27,150 |
11.78 % 6.86 % |
$ 3.25 /MMBtu |
Water Disposal |
2,448,000 Gal 2,448,000 Gal |
$ 4,090 $ 4,090 |
1.88 % 1.88 % |
$ 0 /Gal |
Solid Waste (non-haz) |
10,140 lbs 0 lbs |
$ 160 $ 0 |
9.64 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | 2.2621 | N | $ 0 | $ 9,100 | 0.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 5,000 | $ 22,000 | 0.23 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 03 | view details |
REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | 2.1394 | N | $ 6,000 | $ 10,070 | 0.60 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 04 | view details |
KEEP BOILER TUBES CLEAN | 2.1232 | N | $ 500 | $ 330 | 1.52 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 05 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 16,120 | $ 6,740 | 2.39 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 06 | view details |
REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | 3.5212 | N | $ 0 | $ 160 | 0.00 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
| 07 | view details |
REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | 3.4157 | I | $ 3,000 | $ 5,480 | 0.55 | ||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||