Assessment #OK0726
| Assessment Year | 2006 |
|---|---|
| SIC | 2015 |
| SIC Description | Poultry Slaughtering And Processing |
| NAICS | 311615 |
| NAICS Description | Poultry Processing |
| Principal Product | Poultry Products |
| Sales | $ 200,000,000 |
| # of Employees | 410 |
| Plant Area (Sq.Ft.) | 230,000 |
| Annual Production | 400,000,000 Pounds |
| Production Hrs. Annual | 6,240 |
| Location (State) | AR |
| Yearly Energy Cost | $ 1,443,472 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
15,499,800 kWh | $ 531,643 | $ 0.034 /kWh |
- Demand Charge |
33,608 kW | $ 335,070 | $ 9.97 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
81,925 MMBtu | $ 576,759 | $ 7.04 /MMBtu |
TOTAL ENERGY |
240,798 MMBtu | $ 1,443,472 | $ 5.99 /MMBtu |
Water Disposal |
1,840,582 Gal | $ 291,233 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
380,077 kWh 0 kWh |
$ 13,639 $ 0 |
2.57 % 0.00 % |
$ 0.034 /kWh |
- Demand Charge |
677 kW 0 kW |
$ 6,759 $ 0 |
2.02 % 0.00 % |
$ 9.97 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
18,404 MMBtu 0 MMBtu |
$ 129,519 $ 0 |
22.46 % 0.00 % |
$ 7.04 /MMBtu |
TOTAL ENERGY |
22,300 MMBtu 0 MMBtu |
$ 149,917 $ 0 |
10.39 % 0.00 % |
$ 5.99 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | 2.4234 | N | $ 2,305 | $ 1,838 | 1.25 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 13,554 | $ 11,412 | 1.19 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 339 | $ 2,127 | 0.16 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 32,000 | $ 21,283 | 1.50 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | 2.2441 | N | $ 16,500 | $ 18,769 | 0.88 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | 2.1231 | N | $ 32,500 | $ 31,992 | 1.02 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
RECOVER HEAT FROM REFRIGERATION CONDENSERS | 2.2436 | N | $ 35,269 | $ 55,348 | 0.64 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | N | $ 8,723 | $ 3,168 | 2.75 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | 2.1121 | N | $ 2,006 | $ 579 | 3.46 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 331 | $ 1,213 | 0.27 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | N | $ 5,750 | $ 2,188 | 2.63 | ||||||||||||||||
|
|||||||||||||||||||||||