Industrial Assessment Centers
Assessment #OK0709
| Assessment Year | 2005 |
|---|---|
| SIC | 2851 |
| SIC Description | Paints And Allied Products |
| NAICS | 325510 |
| NAICS Description | Paint and Coating Manufacturing |
| Principal Product | Solvent based coating |
| Sales | $ 28,000,000 |
| # of Employees | 85 |
| Plant Area (Sq.Ft.) | 100,000 |
| Annual Production | 2,800 Thousand Gallons |
| Production Hrs. Annual | 2,600 |
| Location (State) | OK |
| Yearly Energy Cost | $ 248,105 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,202,790 kWh | $ 83,698 | $ 0.070 /kWh |
- Demand Charge |
308 kW | $ 2,521 | $ 8.19 /kW |
- Electricity Fees |
- | $ 16,283 | - |
Natural Gas |
21,542 MMBtu | $ 145,603 | $ 6.76 /MMBtu |
TOTAL ENERGY |
33,871 MMBtu | $ 248,105 | $ 7.33 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
198,353 kWh 0 kWh |
$ 18,885 $ 0 |
22.56 % 0.00 % |
$ 0.070 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 8.19 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,225 MMBtu 545 MMBtu |
$ 8,280 $ 3,684 |
5.69 % 2.53 % |
$ 6.76 /MMBtu |
TOTAL ENERGY |
3,258 MMBtu 545 MMBtu |
$ 27,165 $ 3,684 |
10.95 % 1.48 % |
$ 7.33 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE POWER DURING OFF-PEAK PERIODS | 2.3137 | N | $ 0 | $ 2,560 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 1,030 | $ 3,684 | 0.28 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 11,363 | $ 1,659 | 6.85 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 21,700 | $ 11,493 | 1.89 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | 4.6110 | N | $ 0 | $ 1,000 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSTALL SET-BACK TIMERS | 2.6232 | N | $ 2,205 | $ 4,055 | 0.54 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 4,640 | $ 1,077 | 4.31 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 3,034 | $ 541 | 5.61 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 1,820 | $ 824 | 2.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 109 | $ 127 | 0.86 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 1,000 | $ 159 | 6.29 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 4,181 | $ 696 | 6.01 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||