Industrial Assessment Centers
Assessment #OK0671
| Assessment Year | 2003 |
|---|---|
| SIC | 3011 |
| SIC Description | Tires And Inner Tubes |
| NAICS | 326211 |
| NAICS Description | Tire Manufacturing (except Retreading) |
| Principal Product | Solid Tire and Rim Assemblies |
| Sales | $ 12,000,000 |
| # of Employees | 95 |
| Plant Area (Sq.Ft.) | 300,000 |
| Annual Production | 4,934,754 Pounds |
| Production Hrs. Annual | 2,860 |
| Location (State) | OK |
| Yearly Energy Cost | $ 218,810 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,010,720 kWh | $ 107,701 | $ 0.054 /kWh |
- Electricity Fees |
- | $ 12,948 | - |
Natural Gas |
25,450 MMBtu | $ 98,161 | $ 3.86 /MMBtu |
TOTAL ENERGY |
46,060 MMBtu | $ 218,810 | $ 4.75 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
-22,222 kWh -78,222 kWh |
$ -1,191 $ -4,193 |
-1.11 % -3.89 % |
$ 0.054 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
13,873 MMBtu 12,682 MMBtu |
$ 54,891 $ 50,299 |
55.92 % 51.24 % |
$ 3.86 /MMBtu |
TOTAL ENERGY |
13,645 MMBtu 11,880 MMBtu |
$ 53,700 $ 46,106 |
24.54 % 21.07 % |
$ 4.75 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 4,565 | $ 1,945 | 2.35 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | P | $ 12,625 | $ 3,474 | 3.63 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 318 | $ 880 | 0.36 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 863 | $ 459 | 1.88 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 5,340 | $ 1,789 | 2.98 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | N | $ 9,500 | $ 4,592 | 2.07 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | I | $ 86,000 | $ 114,000 | 0.75 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||