Industrial Assessment Centers
Assessment #OK0602
| Assessment Year | 2000 |
|---|---|
| SIC | 3996 |
| SIC Description | Hard Surface Floor Coverings, Nec |
| NAICS | |
| NAICS Description | |
| Principal Product | Vinyl flooring |
| Sales | $ 70,000,000 |
| # of Employees | 180 |
| Plant Area (Sq.Ft.) | 435,000 |
| Annual Production | 42,000,000 Thousand Feet |
| Production Hrs. Annual | 8,760 |
| Location (State) | OK |
| Yearly Energy Cost | $ 1,478,373 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
24,038,394 kWh | $ 902,876 | $ 0.038 /kWh |
- Demand Charge |
52,929 kW | $ 0 | $ 0.00 /kW |
- Electricity Fees |
- | $ 3,538 | - |
Natural Gas |
226,827 MMBtu | $ 571,959 | $ 2.52 /MMBtu |
TOTAL ENERGY |
473,221 MMBtu | $ 1,478,373 | $ 3.12 /MMBtu |
Solid Waste (non-haz) |
26,010,000 lbs | $ 603,500 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,353,165 kWh 402,989 kWh |
$ 50,872 $ 15,151 |
5.63 % 1.68 % |
$ 0.038 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
735 MMBtu 0 MMBtu |
$ 2,001 $ 0 |
0.35 % 0.00 % |
$ 2.52 /MMBtu |
TOTAL ENERGY |
14,605 MMBtu 4,131 MMBtu |
$ 52,873 $ 15,151 |
3.58 % 1.02 % |
$ 3.12 /MMBtu |
Solid Waste (non-haz) |
40,000 lbs 0 lbs |
$ 8,333 $ 0 |
1.38 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 14,545 | $ 15,151 | 0.96 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
PREHEAT COMBUSTION AIR WITH WASTE HEAT | 2.2442 | N | $ 10,500 | $ 2,001 | 5.25 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | 2.2614 | N | $ 35,000 | $ 26,183 | 1.34 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
INSTALL SKYLIGHTS | 2.7145 | N | $ 5,460 | $ 9,262 | 0.59 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 1,620 | $ 276 | 5.87 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
INSTALL EQUIPMENT TO MOVE PRODUCT | 4.4450 | N | $ 32,400 | $ 229,950 | 0.14 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
INSTALL EQUIPMENT TO MOVE PRODUCT | 4.4450 | N | $ 200,000 | $ 122,640 | 1.63 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
CONTRACT A WOOD PALLET RECYCLING COMPANY | 3.5316 | N | $ 0 | $ 8,333 | 0.00 | ||||||||||||
|
|||||||||||||||||||