Industrial Assessment Centers
Assessment #NC0428
| Assessment Year | 2011 |
|---|---|
| SIC | 3086 |
| SIC Description | Plastics Foam Products |
| NAICS | 326150 |
| NAICS Description | Urethane and Other Foam Product (except Polystyrene) Manufacturing |
| Principal Product | Foam insulation |
| Sales | $ 29,700,000 |
| # of Employees | 81 |
| Plant Area (Sq.Ft.) | 500,000 |
| Annual Production | 30,000 Thousand Feet |
| Production Hrs. Annual | 6,000 |
| Location (State) | NC |
| Yearly Energy Cost | $ 680,758 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,472,454 kWh | $ 343,404 | $ 0.063 /kWh |
- Demand Charge |
10,246 kW | $ 299,212 | $ 29.20 /kW |
- Electricity Fees |
- | $ 2,113 | - |
Natural Gas |
3,085 MMBtu | $ 36,029 | $ 11.68 /MMBtu |
TOTAL ENERGY |
59,178 MMBtu | $ 680,758 | $ 11.50 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
953,198 kWh 1,078,198 kWh |
$ 58,684 $ 66,528 |
17.09 % 19.37 % |
$ 0.063 /kWh |
- Demand Charge |
8,830 kW 8,714 kW |
$ 237,004 $ 236,036 |
79.21 % 78.89 % |
$ 29.20 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
168 MMBtu 168 MMBtu |
$ 1,962 $ 1,962 |
5.45 % 5.45 % |
$ 11.68 /MMBtu |
TOTAL ENERGY |
7,170 MMBtu 8,452 MMBtu |
$ 227,758 $ 234,634 |
33.46 % 34.47 % |
$ 11.50 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | 2.3415 | I | $ 450,915 | $ 145,527 | 3.10 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
IMPROVE SPACE COMFORT CONDITIONING | 4.424 | N | $ 94,425 | $ 60,444 | 1.56 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 287,294 | $ 72,294 | 3.97 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 13,050 | $ 3,540 | 3.69 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 750 | $ 307 | 2.44 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
MAKE ICE DURING OFF PEAK HOURS FOR COOLING | 2.3113 | N | $ 47,000 | $ 7,730 | 6.08 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 25 | $ 4,910 | 0.01 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 100 | $ 681 | 0.15 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||