Industrial Assessment Centers
Assessment #NC0413
| Assessment Year | 2010 |
|---|---|
| SIC | 2086 |
| SIC Description | Bottled And Canned Soft Drinks |
| NAICS | 312111 |
| NAICS Description | Soft Drink Manufacturing |
| Principal Product | Saft drinks and bottled water |
| Sales | $ 55,000,000 |
| # of Employees | 120 |
| Plant Area (Sq.Ft.) | 90,000 |
| Annual Production | 18,200,000 Pieces |
| Production Hrs. Annual | 5,000 |
| Location (State) | VA |
| Yearly Energy Cost | $ 534,956 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,446,240 kWh | $ 189,922 | $ 0.043 /kWh |
- Demand Charge |
10,282 kW | $ 144,359 | $ 14.04 /kW |
- Electricity Fees |
- | $ 21,448 | - |
Natural Gas |
19,670 MMBtu | $ 179,227 | $ 9.11 /MMBtu |
TOTAL ENERGY |
65,244 MMBtu | $ 534,956 | $ 8.20 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
-119,907 kWh 134,193 kWh |
$ -4,311 $ 4,826 |
-2.27 % 2.54 % |
$ 0.043 /kWh |
- Demand Charge |
-418 kW 192 kW |
$ -5,872 $ 2,691 |
-4.07 % 1.86 % |
$ 14.04 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
9,471 MMBtu 148 MMBtu |
$ 86,282 $ 1,349 |
48.14 % 0.75 % |
$ 9.11 /MMBtu |
TOTAL ENERGY |
8,242 MMBtu 1,524 MMBtu |
$ 76,099 $ 8,866 |
14.23 % 1.66 % |
$ 8.20 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 100 | $ 2,881 | 0.03 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 50 | $ 3,796 | 0.01 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
INSULATE FEEDWATER TANK | 2.2123 | I | $ 337 | $ 283 | 1.19 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 1,000 | $ 1,066 | 0.94 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
RECOVER HEAT FROM REFRIGERATION CONDENSERS | 2.2436 | N | $ 190,000 | $ 67,233 | 2.83 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||