Industrial Assessment Centers
Assessment #NC0409
| Assessment Year | 2010 |
|---|---|
| SIC | 3052 |
| SIC Description | Rubber & Plastics Hose & Belting |
| NAICS | 314999 |
| NAICS Description | All Other Miscellaneous Textile Product Mills |
| Principal Product | Fire hose |
| Sales | $ 15,000,000 |
| # of Employees | 60 |
| Plant Area (Sq.Ft.) | 150,000 |
| Annual Production | 300 Thousand Feet |
| Production Hrs. Annual | 4,500 |
| Location (State) | NC |
| Yearly Energy Cost | $ 285,477 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,264,900 kWh | $ 125,013 | $ 0.055 /kWh |
- Demand Charge |
7,600 kW | $ 63,130 | $ 8.31 /kW |
- Electricity Fees |
- | $ 2,085 | - |
LPG |
614 MMBtu | $ 20,730 | $ 33.76 /MMBtu |
Fuel Oil #2 |
5,590 MMBtu | $ 74,519 | $ 13.33 /MMBtu |
TOTAL ENERGY |
29,419 MMBtu | $ 285,477 | $ 9.70 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
92,615 kWh 92,615 kWh |
$ 5,091 $ 5,091 |
4.07 % 4.07 % |
$ 0.055 /kWh |
- Demand Charge |
159 kW 159 kW |
$ 1,330 $ 1,330 |
2.11 % 2.11 % |
$ 8.31 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
LPG |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 33.76 /MMBtu |
Fuel Oil #2 |
11 MMBtu 11 MMBtu |
$ 204 $ 204 |
0.27 % 0.27 % |
$ 13.33 /MMBtu |
TOTAL ENERGY |
961 MMBtu 961 MMBtu |
$ 6,625 $ 6,625 |
2.32 % 2.32 % |
$ 9.70 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 50 | $ 1,415 | 0.04 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 100 | $ 613 | 0.16 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 2,538 | $ 1,256 | 2.02 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
USE MINIMUM STEAM OPERATING PRESSURE | 2.2163 | I | $ 100 | $ 204 | 0.49 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | I | $ 736 | $ 1,539 | 0.48 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 1,151 | $ 969 | 1.19 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 133 | $ 269 | 0.49 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||