Industrial Assessment Centers
Assessment #NC0329
| Assessment Year | 2005 |
|---|---|
| SIC | 3271 |
| SIC Description | Concrete Block And Brick |
| NAICS | 327331 |
| NAICS Description | Concrete Block and Brick Manufacturing |
| Principal Product | Concrete blocks and ready mix concrete |
| Sales | $ 12,000,000 |
| # of Employees | 50 |
| Plant Area (Sq.Ft.) | 70,000 |
| Annual Production | 2,500,000 Pieces |
| Production Hrs. Annual | 3,000 |
| Location (State) | VA |
| Yearly Energy Cost | $ 79,219 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
729,672 kWh | $ 24,397 | $ 0.033 /kWh |
- Demand Charge |
3,284 kW | $ 21,509 | $ 6.55 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
3,922 MMBtu | $ 33,313 | $ 8.49 /MMBtu |
TOTAL ENERGY |
11,401 MMBtu | $ 79,219 | $ 6.95 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
118,503 kWh 21,093 kWh |
$ 3,957 $ 704 |
16.22 % 2.89 % |
$ 0.033 /kWh |
- Demand Charge |
476 kW 86 kW |
$ 3,113 $ 560 |
14.47 % 2.60 % |
$ 6.55 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
122 MMBtu 0 MMBtu |
$ 1,036 $ 0 |
3.11 % 0.00 % |
$ 8.49 /MMBtu |
TOTAL ENERGY |
1,336 MMBtu 215 MMBtu |
$ 8,106 $ 1,264 |
10.23 % 1.60 % |
$ 6.95 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE OVER-SIZE MOTORS AND PUMPS WITH OPTIMUM SIZE | 2.4131 | N | $ 3,000 | $ 4,470 | 0.67 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | N | $ 2,000 | $ 1,086 | 1.84 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 200 | $ 400 | 0.50 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
DEVELOP A REPAIR/REPLACE POLICY | 2.4151 | I | $ 28 | $ 38 | 0.74 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 1,770 | $ 1,036 | 1.71 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 50 | $ 495 | 0.10 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 249 | $ 149 | 1.67 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 2,200 | $ 1,379 | 1.60 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||