Assessment #NC0145
| Assessment Year | 1998 |
|---|---|
| SIC | 2750 |
| SIC Description | |
| NAICS | |
| NAICS Description | |
| Principal Product | Commercial printer |
| Sales | $ 50,000,000 |
| # of Employees | 134 |
| Plant Area (Sq.Ft.) | 102,000 |
| Annual Production | 35,000,000 Pounds |
| Production Hrs. Annual | 6,000 |
| Location (State) | NC |
| Yearly Energy Cost | $ 360,660 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,050,410 kWh | $ 141,372 | $ 0.028 /kWh |
- Demand Charge |
14,163 kW | $ 118,871 | $ 8.39 /kW |
- Electricity Fees |
- | $ 37,812 | - |
Natural Gas |
9,941 MMBtu | $ 62,605 | $ 6.30 /MMBtu |
TOTAL ENERGY |
61,708 MMBtu | $ 360,660 | $ 5.84 /MMBtu |
Water Disposal |
1,080,000 Gal | $ 9,288 | $ 0 /Gal |
Solid Waste (non-haz) |
295,000 lbs | $ 4,433 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
550,996 kWh 0 kWh |
$ 15,426 $ 0 |
10.91 % 0.00 % |
$ 0.028 /kWh |
- Demand Charge |
487 kW 0 kW |
$ 4,374 $ 0 |
3.68 % 0.00 % |
$ 8.39 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 6.30 /MMBtu |
TOTAL ENERGY |
5,647 MMBtu 0 MMBtu |
$ 19,800 $ 0 |
5.49 % 0.00 % |
$ 5.84 /MMBtu |
Water Disposal |
1,080,000 Gal 0 Gal |
$ 9,288 $ 0 |
100.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
295,000 lbs 75,000 lbs |
$ 4,433 $ 1,125 |
100.00 % 25.38 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | 2.2614 | N | $ 25,000 | $ 5,611 | 4.46 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | 2.2622 | N | $ 125,000 | $ 33,755 | 3.70 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 25 | $ 434 | 0.06 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
REUSE / RECYCLE/ SELL PAPER PRODUCTS | 3.5217 | N | $ 200 | $ 3,308 | 0.06 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | 3.1191 | I | $ 100 | $ 22,875 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
REUSE / RECYCLE/ SELL PAPER PRODUCTS | 3.5217 | I | $ 150 | $ 1,125 | 0.13 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | 3.4114 | N | $ 1,200 | $ 9,088 | 0.13 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
MODIFY PROCESS TO REDUCE MATERIAL USE/COST | 4.1310 | N | $ 405,000 | $ 111,500 | 3.63 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||