Industrial Assessment Centers
Assessment #NC0113
| Assessment Year | 1997 |
|---|---|
| SIC | 3400 |
| SIC Description | |
| NAICS | |
| NAICS Description | |
| Principal Product | Industrial access equipment and ladders |
| Sales | $ 25,000,000 |
| # of Employees | 230 |
| Plant Area (Sq.Ft.) | 127,422 |
| Annual Production | 18,500,000 Pounds |
| Production Hrs. Annual | 2,626 |
| Location (State) | SC |
| Yearly Energy Cost | $ 112,759 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,282,532 kWh | $ 66,744 | $ 0.052 /kWh |
- Demand Charge |
4,630 kW | $ 17,594 | $ 3.80 /kW |
- Electricity Fees |
- | $ 6,527 | - |
Natural Gas |
2,842 MMBtu | $ 21,894 | $ 7.70 /MMBtu |
TOTAL ENERGY |
15,988 MMBtu | $ 112,759 | $ 7.05 /MMBtu |
Solid Waste (non-haz) |
161,250 lbs | $ 4,031 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
173,212 kWh 12,896 kWh |
$ 9,025 $ 668 |
13.52 % 1.00 % |
$ 0.052 /kWh |
- Demand Charge |
712 kW 51 kW |
$ 2,710 $ 195 |
15.40 % 1.11 % |
$ 3.80 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
232 MMBtu 0 MMBtu |
$ 1,786 $ 0 |
8.16 % 0.00 % |
$ 7.70 /MMBtu |
TOTAL ENERGY |
2,007 MMBtu 132 MMBtu |
$ 13,521 $ 863 |
11.99 % 0.77 % |
$ 7.05 /MMBtu |
Solid Waste (non-haz) |
161,250 lbs 0 lbs |
$ 4,031 $ 0 |
100.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | N | $ 15,000 | $ 10,733 | 1.40 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
REVISE SMOKE CLEANUP FROM OPERATIONS | 2.7244 | N | $ 3,400 | $ 1,447 | 2.35 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 240 | $ 252 | 0.95 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 210 | $ 863 | 0.24 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 1,400 | $ 226 | 6.19 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY | 3.5245 | N | $ 500 | $ 831 | 0.60 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | 3.5315 | N | $ 5,200 | $ 5,500 | 0.95 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | 4.6240 | N | $ 8,000 | $ 163,000 | 0.05 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | 4.4310 | N | $ 10,500 | $ 11,000 | 0.95 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | 4.3220 | N | $ 56,000 | $ 32,711 | 1.71 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||