Industrial Assessment Centers
Assessment #MZ0072
| Assessment Year | 2012 |
|---|---|
| SIC | 2759 |
| SIC Description | Commercial Printing, Nec |
| NAICS | 323112 |
| NAICS Description | Commercial Flexographic Printing |
| Principal Product | printed labels |
| Sales | $ 1,850,000 |
| # of Employees | 65 |
| Plant Area (Sq.Ft.) | 65,000 |
| Annual Production | 250 Tons |
| Production Hrs. Annual | 6,000 |
| Location (State) | KS |
| Yearly Energy Cost | $ 2,266,771 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
23,742,566 kWh | $ 2,248,421 | $ 0.095 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
1,711 MMBtu | $ 18,350 | $ 10.72 /MMBtu |
TOTAL ENERGY |
245,075 MMBtu | $ 2,266,771 | $ 9.25 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,780,330 kWh 1,739,598 kWh |
$ 169,899 $ 165,971 |
7.56 % 7.38 % |
$ 0.095 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 10.72 /MMBtu |
TOTAL ENERGY |
18,249 MMBtu 17,831 MMBtu |
$ 172,464 $ 168,536 |
7.61 % 7.44 % |
$ 9.25 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 19,300 | $ 19,745 | 0.98 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 56,140 | $ 44,200 | 1.27 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 180 | $ 2,639 | 0.07 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 400 | $ 2,260 | 0.18 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | N | $ 0 | $ 1,345 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | 2.7264 | I | $ 4,500 | $ 8,585 | 0.52 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | 2.7262 | I | $ 1,160 | $ 36,070 | 0.03 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | 2.6212 | N | $ 0 | $ 2,583 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,120 | $ 4,875 | 0.23 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 438 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 15,058 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 12 | view details |
LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | 2.7221 | I | $ 0 | $ 22,620 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 13 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 12,046 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||