| Assessment Year | 2011 |
|---|---|
| SIC | 3499 |
| SIC Description | Fabricated Metal Products, Nec |
| NAICS | 332999 |
| NAICS Description | All Other Miscellaneous Fabricated Metal Product Manufacturing |
| Principal Product | Steel couplings for hydraulic hoses |
| Sales | $ 50,000,000 |
| # of Employees | 100 |
| Plant Area (Sq.Ft.) | 80,000 |
| Annual Production | 60,000,000 Pieces |
| Production Hrs. Annual | 8,000 |
| Location (State) | MO |
| Yearly Energy Cost | $ 808,876 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,709,300 kWh | $ 462,192 | $ 0.060 /kWh |
- Demand Charge |
15,887 kW | $ 127,096 | $ 8.00 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
31,823 MMBtu | $ 219,588 | $ 6.90 /MMBtu |
TOTAL ENERGY |
110,844 MMBtu | $ 808,876 | $ 7.30 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,380,324 kWh 1,084,354 kWh |
$ 140,519 $ 62,761 |
30.40 % 13.58 % |
$ 0.060 /kWh |
- Demand Charge |
2,504 kW 632 kW |
$ 20,040 $ 5,064 |
15.77 % 3.98 % |
$ 8.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
10,530 MMBtu 7,569 MMBtu |
$ 72,663 $ 52,233 |
33.09 % 23.79 % |
$ 6.90 /MMBtu |
TOTAL ENERGY |
34,929 MMBtu 18,684 MMBtu |
$ 233,221 $ 120,057 |
28.83 % 14.84 % |
$ 7.30 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,160 | $ 7,242 | 0.16 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | I | $ 49,280 | $ 31,772 | 1.55 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 1,840 | $ 1,292 | 1.42 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
INSTALL SPECTRAL REFLECTORS / DELAMP | 2.7144 | I | $ 100 | $ 1,360 | 0.07 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | 2.7492 | N | $ 1,498 | $ 866 | 1.73 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | 2.3412 | N | $ 250,000 | $ 89,844 | 2.78 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,300 | $ 26,441 | 0.05 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 15,000 | $ 8,105 | 1.85 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 9,000 | $ 4,053 | 2.22 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 30,000 | $ 19,502 | 1.54 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | I | $ 10,000 | $ 17,836 | 0.56 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | 2.7492 | N | $ 60 | $ 62 | 0.97 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | 2.7133 | I | $ 300 | $ 91 | 3.30 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 14 | view details |
REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | 2.1321 | I | $ 150,000 | $ 11,657 | 12.87 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 15 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 1,500 | $ 1,598 | 0.94 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 16 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | I | $ 18,000 | $ 11,500 | 1.57 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||