Industrial Assessment Centers
Assessment #MS0301
| Assessment Year | 2006 |
|---|---|
| SIC | 3728 |
| SIC Description | Aircraft Parts And Equipment, Nec |
| NAICS | 336413 |
| NAICS Description | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| Principal Product | Aircraft parts |
| Sales | $ 37,000,000 |
| # of Employees | 340 |
| Plant Area (Sq.Ft.) | 400,000 |
| Annual Production | 223,000 Pieces |
| Production Hrs. Annual | 4,992 |
| Location (State) | AR |
| Yearly Energy Cost | $ 1,420,108 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
11,755,748 kWh | $ 275,694 | $ 0.023 /kWh |
- Demand Charge |
24,970 kW | $ 78,216 | $ 3.13 /kW |
- Electricity Fees |
- | $ 33,818 | - |
Natural Gas |
117,572 MMBtu | $ 1,032,380 | $ 8.78 /MMBtu |
TOTAL ENERGY |
238,068 MMBtu | $ 1,420,108 | $ 5.97 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
808,140 kWh 672,134 kWh |
$ 11,119 $ 9,248 |
4.03 % 3.35 % |
$ 0.023 /kWh |
- Demand Charge |
1,032 kW 873 kW |
$ 7,296 $ 6,172 |
9.33 % 7.89 % |
$ 3.13 /kW |
- Electricity Fees |
- |
$ 1,384 $ 1,312 |
4.09 % 3.88 % |
- |
Natural Gas |
2,105 MMBtu 2,105 MMBtu |
$ 18,787 $ 18,787 |
1.82 % 1.82 % |
$ 8.78 /MMBtu |
TOTAL ENERGY |
10,390 MMBtu 8,995 MMBtu |
$ 38,586 $ 35,519 |
2.72 % 2.50 % |
$ 5.97 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
RECOVER WASTE HEAT FROM EQUIPMENT | 2.2437 | I | $ 21,720 | $ 17,310 | 1.25 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 30,484 | $ 12,625 | 2.41 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 21,914 | $ 3,037 | 7.22 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 9,150 | $ 2,153 | 4.25 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
BURN WASTE OIL FOR HEAT | 3.6124 | I | $ 2,186 | $ 1,477 | 1.48 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 244 | $ 1,070 | 0.23 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | N | $ 4,882 | $ 914 | 5.34 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||