Industrial Assessment Centers
Assessment #MS0268
| Assessment Year | 2005 |
|---|---|
| SIC | 3996 |
| SIC Description | Hard Surface Floor Coverings, Nec |
| NAICS | 326192 |
| NAICS Description | Resilient Floor Covering Manufacturing |
| Principal Product | Vinly Flooring Tile |
| Sales | $ 56,000,000 |
| # of Employees | 138 |
| Plant Area (Sq.Ft.) | 300,000 |
| Annual Production | 140,000 Thousand Feet |
| Production Hrs. Annual | 8,400 |
| Location (State) | MS |
| Yearly Energy Cost | $ 1,731,083 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
17,941,770 kWh | $ 732,252 | $ 0.041 /kWh |
- Demand Charge |
32,312 kW | $ 119,702 | $ 3.70 /kW |
- Electricity Fees |
- | $ 370,644 | - |
Natural Gas |
71,682 MMBtu | $ 508,485 | $ 7.09 /MMBtu |
TOTAL ENERGY |
255,585 MMBtu | $ 1,731,083 | $ 6.77 /MMBtu |
Water Disposal |
1,786,700 Gal | $ 35,429 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,014,241 kWh 0 kWh |
$ 33,802 $ 0 |
4.62 % 0.00 % |
$ 0.041 /kWh |
- Demand Charge |
644 kW 0 kW |
$ 2,254 $ 0 |
1.88 % 0.00 % |
$ 3.70 /kW |
- Electricity Fees |
- |
$ 25,492 $ 0 |
6.88 % 0.00 % |
- |
Natural Gas |
1,297 MMBtu 0 MMBtu |
$ 9,197 $ 0 |
1.81 % 0.00 % |
$ 7.09 /MMBtu |
TOTAL ENERGY |
11,693 MMBtu 0 MMBtu |
$ 70,745 $ 0 |
4.09 % 0.00 % |
$ 6.77 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 132 $ 0 |
0.37 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | N | $ 44,786 | $ 23,099 | 1.94 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 26,992 | $ 9,715 | 2.78 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | 2.7124 | N | $ 180 | $ 8,274 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 5,265 | $ 8,048 | 0.65 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 509 | $ 7,966 | 0.06 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
REPAIR AND ELIMINATE STEAM LEAKS | 2.2135 | N | $ 19 | $ 7,305 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 0 | $ 4,446 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 939 | $ 1,892 | 0.50 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 0 | $ 132 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||