Industrial Assessment Centers
Assessment #MI0224
| Assessment Year | 2012 |
|---|---|
| SIC | 2673 |
| SIC Description | Bags: Plastics, Laminated, & Coated |
| NAICS | 326111 |
| NAICS Description | Plastics Bag Manufacturing |
| Principal Product | Plastic Bags |
| Sales | $ 17,000,000 |
| # of Employees | 48 |
| Plant Area (Sq.Ft.) | 51,000 |
| Annual Production | 17,000,000 Pounds |
| Production Hrs. Annual | 8,736 |
| Location (State) | FL |
| Yearly Energy Cost | $ 496,051 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,278,403 kWh | $ 406,873 | $ 0.077 /kWh |
- Demand Charge |
10,343 kW | $ 49,880 | $ 4.82 /kW |
- Electricity Fees |
- | $ 39,297 | - |
TOTAL ENERGY |
54,104 MMBtu | $ 496,051 | $ 9.17 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
674,093 kWh 485,639 kWh |
$ 51,904 $ 37,394 |
12.76 % 9.19 % |
$ 0.077 /kWh |
- Demand Charge |
1,165 kW 799 kW |
$ 5,616 $ 3,852 |
11.26 % 7.72 % |
$ 4.82 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
TOTAL ENERGY |
6,910 MMBtu 4,978 MMBtu |
$ 57,520 $ 41,246 |
11.60 % 8.31 % |
$ 9.17 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | I | $ 11,960 | $ 20,266 | 0.59 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 2,135 | $ 14,666 | 0.15 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | I | $ 12,324 | $ 6,947 | 1.77 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | I | $ 3,480 | $ 5,323 | 0.65 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,660 | $ 3,130 | 0.53 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | 2.5121 | I | $ 2,594 | $ 996 | 2.60 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 520 | $ 1,962 | 0.27 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 80 | $ 1,668 | 0.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSTALL SKYLIGHTS | 2.7145 | N | $ 5,550 | $ 1,608 | 3.45 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 1,230 | $ 954 | 1.29 | ||||||||||||||||
|
|||||||||||||||||||||||