Industrial Assessment Centers
Assessment #ME0286
| Assessment Year | 2000 |
|---|---|
| SIC | 3144 |
| SIC Description | Women's Footwear, Except Athletic |
| NAICS | |
| NAICS Description | |
| Principal Product | Athletic Shoes |
| Sales | $ 30,000,000 |
| # of Employees | 375 |
| Plant Area (Sq.Ft.) | 127,785 |
| Annual Production | 1,600,000 Pieces |
| Production Hrs. Annual | 2,500 |
| Location (State) | ME |
| Yearly Energy Cost | $ 244,219 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,181,712 kWh | $ 130,872 | $ 0.060 /kWh |
- Demand Charge |
7,455 kW | $ 94,755 | $ 12.71 /kW |
- Electricity Fees |
- | $ 0 | - |
Fuel Oil #2 |
5,880 MMBtu | $ 18,592 | $ 3.16 /MMBtu |
TOTAL ENERGY |
28,243 MMBtu | $ 244,219 | $ 8.65 /MMBtu |
Solid Waste (non-haz) |
775,000 lbs | $ 3,750 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
334,407 kWh 303,047 kWh |
$ 19,803 $ 17,952 |
15.13 % 13.72 % |
$ 0.060 /kWh |
- Demand Charge |
102 kW 102 kW |
$ 1,296 $ 1,296 |
1.37 % 1.37 % |
$ 12.71 /kW |
- Electricity Fees |
- |
$ 30,810 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #2 |
-23 MMBtu -579 MMBtu |
$ 693 $ -1,865 |
3.73 % -10.03 % |
$ 3.16 /MMBtu |
TOTAL ENERGY |
3,171 MMBtu 2,294 MMBtu |
$ 50,392 $ 15,173 |
20.63 % 6.21 % |
$ 8.65 /MMBtu |
Solid Waste (non-haz) |
775,000 lbs 775,000 lbs |
$ 46,375 $ 46,375 |
1,236.67 % 1,236.67 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REUSE / RECYCLE/ SELL PAPER PRODUCTS | 3.5217 | I | $ 0 | $ 46,375 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 0 | $ 30,810 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | I | $ 16,265 | $ 7,566 | 2.15 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | I | $ 1,750 | $ 1,006 | 1.74 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | 3.1191 | I | $ 850 | $ 3,750 | 0.23 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 80 | $ 3,736 | 0.02 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 3,563 | $ 2,865 | 1.24 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 1,844 | $ 2,558 | 0.72 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INCREASE USE OF AUTOMATION | 3.2176 | N | $ 2,515 | $ 1,851 | 1.36 | ||||||||||||||||
|
|||||||||||||||||||||||