Assessment #ME0262
| Assessment Year | 1999 |
|---|---|
| SIC | 2819 |
| SIC Description | Industrial Inorganic Chemicals, Nec |
| NAICS | |
| NAICS Description | |
| Principal Product | chlorine |
| Sales | $ 27,000,000 |
| # of Employees | 68 |
| Plant Area (Sq.Ft.) | 151,682 |
| Annual Production | 65,456 Tons |
| Production Hrs. Annual | 8,760 |
| Location (State) | ME |
| Yearly Energy Cost | $ 542,791 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
8,616,647 kWh | $ 400,000 | $ 0.046 /kWh |
- Electricity Fees |
- | $ 1,200 | - |
Fuel Oil #2 |
33,225 MMBtu | $ 141,591 | $ 4.26 /MMBtu |
TOTAL ENERGY |
121,546 MMBtu | $ 542,791 | $ 4.47 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
358,440 kWh 0 kWh |
$ 16,842 $ 0 |
4.21 % 0.00 % |
$ 0.046 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #2 |
5,532 MMBtu 0 MMBtu |
$ 24,679 $ 0 |
17.43 % 0.00 % |
$ 4.26 /MMBtu |
TOTAL ENERGY |
9,206 MMBtu 0 MMBtu |
$ 41,521 $ 0 |
7.65 % 0.00 % |
$ 4.47 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | K | $ 400 | $ 18,075 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | K | $ 48,407 | $ 13,608 | 3.56 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | K | $ 680 | $ 3,246 | 0.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | K | $ 100 | $ 2,670 | 0.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | K | $ 865 | $ 2,332 | 0.37 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
PAY BILLS ON TIME TO AVOID LATE FEES | 4.8210 | K | $ 0 | $ 1,883 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | K | $ 1,078 | $ 564 | 1.91 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REPAIR AND ELIMINATE STEAM LEAKS | 2.2135 | K | $ 260 | $ 1,054 | 0.25 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||