Industrial Assessment Centers
Assessment #ME0256
| Assessment Year | 1999 |
|---|---|
| SIC | 2024 |
| SIC Description | Ice Cream And Frozen Desserts |
| NAICS | |
| NAICS Description | |
| Principal Product | Ice-cream |
| Sales | $ 2,600,000 |
| # of Employees | 90 |
| Plant Area (Sq.Ft.) | 12,100 |
| Annual Production | 8,100,000 Pieces |
| Production Hrs. Annual | 4,500 |
| Location (State) | VT |
| Yearly Energy Cost | $ 479,942 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,175,850 kWh | $ 281,160 | $ 0.054 /kWh |
- Demand Charge |
11,261 kW | $ 78,110 | $ 6.94 /kW |
- Electricity Fees |
- | $ 80,126 | - |
Fuel Oil #2 |
7,587 MMBtu | $ 40,546 | $ 5.34 /MMBtu |
TOTAL ENERGY |
60,639 MMBtu | $ 479,942 | $ 7.91 /MMBtu |
Solid Waste (non-haz) |
39 lbs | $ 2,925 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
152,696 kWh 80,598 kWh |
$ 14,042 $ 7,562 |
4.99 % 2.69 % |
$ 0.054 /kWh |
- Demand Charge |
249 kW 33 kW |
$ 1,713 $ 213 |
2.19 % 0.27 % |
$ 6.94 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #2 |
148 MMBtu 148 MMBtu |
$ 1,217 $ 1,217 |
3.00 % 3.00 % |
$ 5.34 /MMBtu |
TOTAL ENERGY |
1,406 MMBtu 974 MMBtu |
$ 14,100 $ 8,992 |
2.94 % 1.87 % |
$ 7.91 /MMBtu |
Solid Waste (non-haz) |
58,500 lbs 0 lbs |
$ 2,193 $ 0 |
74.97 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 11,800 | $ 5,108 | 2.31 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | 2.2523 | I | $ 900 | $ 4,700 | 0.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 2,500 | $ 2,563 | 0.98 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 185 | $ 512 | 0.36 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
REDUCE COMBUSTION AIR FLOW TO OPTIMUM | 2.1113 | I | $ 400 | $ 337 | 1.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 400 | $ 325 | 1.23 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 590 | $ 319 | 1.85 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 93 | $ 236 | 0.39 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
REDUCE OR ELIMINATE WASTE | 3.7214 | N | $ 31,200 | $ 23,643 | 1.32 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||