Industrial Assessment Centers
Assessment #ME0213
| Assessment Year | 1997 |
|---|---|
| SIC | 3634 |
| SIC Description | Electric Housewares And Fans |
| NAICS | |
| NAICS Description | |
| Principal Product | electric heaters |
| Sales | $ 8,000,000 |
| # of Employees | 135 |
| Plant Area (Sq.Ft.) | 57,000 |
| Annual Production | 20,000 Not Available |
| Production Hrs. Annual | 4,200 |
| Location (State) | ME |
| Yearly Energy Cost | $ 110,417 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
961,020 kWh | $ 66,370 | $ 0.069 /kWh |
- Demand Charge |
3,024 kW | $ 20,696 | $ 6.84 /kW |
- Electricity Fees |
- | $ 5,497 | - |
LPG |
54 MMBtu | $ 708 | $ 13.11 /MMBtu |
Fuel Oil #2 |
3,439 MMBtu | $ 17,146 | $ 4.99 /MMBtu |
TOTAL ENERGY |
13,343 MMBtu | $ 110,417 | $ 8.28 /MMBtu |
Solid Waste (non-haz) |
15,200 lbs | $ 811 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
194,900 kWh 112,544 kWh |
$ 13,643 $ 7,891 |
20.56 % 11.89 % |
$ 0.069 /kWh |
- Demand Charge |
766 kW 311 kW |
$ 5,306 $ 2,154 |
25.64 % 10.41 % |
$ 6.84 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
LPG |
-164 MMBtu 0 MMBtu |
$ -1,616 $ 0 |
-228.25 % 0.00 % |
$ 13.11 /MMBtu |
Fuel Oil #2 |
-166 MMBtu 0 MMBtu |
$ -858 $ 0 |
-5.00 % 0.00 % |
$ 4.99 /MMBtu |
TOTAL ENERGY |
1,668 MMBtu 1,153 MMBtu |
$ 16,475 $ 10,045 |
14.92 % 9.10 % |
$ 8.28 /MMBtu |
Solid Waste (non-haz) |
15,200 lbs 15,200 lbs |
$ 5,108 $ 5,108 |
629.84 % 629.84 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 25,615 | $ 9,045 | 2.83 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 4,075 | $ 3,936 | 1.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 8,000 | $ 2,494 | 3.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | 4.6230 | I | $ 1,500 | $ 1,800 | 0.83 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
PAY UTILITY BILLS ON TIME | 2.8123 | N | $ 0 | $ 1,361 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | 2.8114 | N | $ 2,300 | $ 1,128 | 2.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 325 | $ 642 | 0.51 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 500 | $ 358 | 1.40 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | 2.8121 | I | $ 0 | $ 120 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
MINIMIZE WATER USAGE | 3.4151 | I | $ 600 | $ 5,298 | 0.11 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
RECOVER AND REUSE WASTE MATERIAL | 3.5311 | I | $ 12,577 | $ 4,029 | 3.12 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | 3.5315 | I | $ 6,200 | $ 1,079 | 5.75 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | 3.2123 | I | $ 525 | $ 786 | 0.67 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||