Industrial Assessment Centers
Assessment #ME0181
| Assessment Year | 1996 |
|---|---|
| SIC | 3149 |
| SIC Description | Footwear, Except Rubber, Nec |
| NAICS | |
| NAICS Description | |
| Principal Product | shoes |
| Sales | $ 7,525,000 |
| # of Employees | 100 |
| Plant Area (Sq.Ft.) | 80,000 |
| Annual Production | 215,000 Pieces |
| Production Hrs. Annual | 2,000 |
| Location (State) | ME |
| Yearly Energy Cost | $ 157,586 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,197,831 kWh | $ 83,832 | $ 0.070 /kWh |
- Demand Charge |
5,422 kW | $ 45,053 | $ 8.31 /kW |
- Electricity Fees |
- | $ 2,119 | - |
Natural Gas |
4 MMBtu | $ 117 | $ 29.25 /MMBtu |
Fuel Oil #6 |
8,002 MMBtu | $ 26,465 | $ 3.31 /MMBtu |
TOTAL ENERGY |
20,284 MMBtu | $ 157,586 | $ 7.77 /MMBtu |
Water Disposal |
2,322,690 Gal | $ 4,108 | $ 0 /Gal |
Other Liquid (non-haz) |
2,322,690 Gal | $ 2,056 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
223,915 kWh 215,416 kWh |
$ 14,960 $ 14,364 |
17.85 % 17.13 % |
$ 0.070 /kWh |
- Demand Charge |
444 kW 444 kW |
$ 3,640 $ 3,640 |
8.08 % 8.08 % |
$ 8.31 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 29.25 /MMBtu |
Fuel Oil #6 |
781 MMBtu 781 MMBtu |
$ 2,583 $ 2,583 |
9.76 % 9.76 % |
$ 3.31 /MMBtu |
TOTAL ENERGY |
3,075 MMBtu 2,988 MMBtu |
$ 21,183 $ 20,587 |
13.44 % 13.06 % |
$ 7.77 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Other Liquid (non-haz) |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 27,695 | $ 9,271 | 2.99 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | I | $ 632 | $ 2,099 | 0.30 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 1,130 | $ 1,990 | 0.57 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 750 | $ 1,653 | 0.45 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
CLOSE OFF UNNEEDED STEAM LINES | 2.2153 | I | $ 200 | $ 2,370 | 0.08 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,000 | $ 1,212 | 0.83 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
TURN OFF EQUIPMENT WHEN NOT IN USE | 2.6218 | I | $ 0 | $ 1,069 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 400 | $ 923 | 0.43 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 305 | $ 596 | 0.51 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
PAY UTILITY BILLS ON TIME | 2.8123 | I | $ 0 | $ 1,608 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||