Industrial Assessment Centers
Assessment #MA0620
| Assessment Year | 2007 |
|---|---|
| SIC | 3357 |
| SIC Description | Nonferrous Wiredrawing & Insulating |
| NAICS | 331422 |
| NAICS Description | Copper Wire (except Mechanical) Drawing |
| Principal Product | Copper wire |
| Sales | $ 80,000,000 |
| # of Employees | 160 |
| Plant Area (Sq.Ft.) | 324,594 |
| Annual Production | 4,800 Tons |
| Production Hrs. Annual | 8,760 |
| Location (State) | NH |
| Yearly Energy Cost | $ 2,300,436 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
16,553,128 kWh | $ 2,017,195 | $ 0.122 /kWh |
- Demand Charge |
29,906 kW | $ 213,960 | $ 7.15 /kW |
- Electricity Fees |
- | $ 2,190 | - |
LPG |
581 MMBtu | $ 8,717 | $ 15.00 /MMBtu |
Fuel Oil #2 |
3,921 MMBtu | $ 58,374 | $ 14.89 /MMBtu |
TOTAL ENERGY |
174,172 MMBtu | $ 2,300,436 | $ 13.21 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,584,983 kWh 148,343 kWh |
$ 193,425 $ 18,156 |
9.59 % 0.90 % |
$ 0.122 /kWh |
- Demand Charge |
3,912 kW 246 kW |
$ 27,970 $ 1,758 |
13.07 % 0.82 % |
$ 7.15 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
LPG |
-5,478 MMBtu 0 MMBtu |
$ -95,335 $ 0 |
-1,093.67 % 0.00 % |
$ 15.00 /MMBtu |
Fuel Oil #2 |
3,816 MMBtu 2,892 MMBtu |
$ 63,630 $ 49,762 |
109.00 % 85.25 % |
$ 14.89 /MMBtu |
TOTAL ENERGY |
14,586 MMBtu 4,414 MMBtu |
$ 189,690 $ 69,676 |
8.25 % 3.03 % |
$ 13.21 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 100,250 | $ 84,828 | 1.18 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
HEAT WATER WITH EXHAUST HEAT | 2.2447 | I | $ 44,540 | $ 25,021 | 1.78 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | 4.6520 | N | $ 85,000 | $ 23,390 | 3.63 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 24,820 | $ 19,535 | 1.27 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | I | $ 1,776 | $ 9,514 | 0.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | I | $ 8,100 | $ 8,532 | 0.95 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 10,990 | $ 7,012 | 1.57 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 20,175 | $ 4,784 | 4.22 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 3,025 | $ 1,751 | 1.73 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
INSTALL AIR SEALS AROUND TRUCK LOADING DOCK DOORS | 2.7443 | I | $ 6,022 | $ 5,323 | 1.13 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||