| Assessment Year | 2002 |
|---|---|
| SIC | 3341 |
| SIC Description | Secondary Nonferrous Metals |
| NAICS | |
| NAICS Description | |
| Principal Product | Bonded metals |
| Sales | $ 22,000,000 |
| # of Employees | 80 |
| Plant Area (Sq.Ft.) | 79,700 |
| Annual Production | 3,800,000 Pounds |
| Production Hrs. Annual | 2,750 |
| Location (State) | MA |
| Yearly Energy Cost | $ 411,298 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,797,600 kWh | $ 207,917 | $ 0.074 /kWh |
- Demand Charge |
11,864 kW | $ 97,878 | $ 8.25 /kW |
- Electricity Fees |
- | $ 14,168 | - |
Natural Gas |
7,369 MMBtu | $ 91,335 | $ 12.39 /MMBtu |
TOTAL ENERGY |
36,044 MMBtu | $ 411,298 | $ 11.41 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
55,901 kWh 55,901 kWh |
$ 3,897 $ 3,897 |
1.87 % 1.87 % |
$ 0.074 /kWh |
- Demand Charge |
4,666 kW 4,666 kW |
$ 38,495 $ 38,495 |
39.33 % 39.33 % |
$ 8.25 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
982 MMBtu 982 MMBtu |
$ 10,589 $ 10,589 |
11.59 % 11.59 % |
$ 12.39 /MMBtu |
TOTAL ENERGY |
1,555 MMBtu 1,555 MMBtu |
$ 52,981 $ 52,981 |
12.88 % 12.88 % |
$ 11.41 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | I | $ 4,090 | $ 38,495 | 0.11 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
APPLY FOR INVESTMENT INCENTIVES | 4.8120 | I | $ 0 | $ 15,314 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 14,100 | $ 10,764 | 1.31 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 6,950 | $ 4,282 | 1.62 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 605 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
PAY BILLS ON TIME TO AVOID LATE FEES | 4.8210 | I | $ 0 | $ 483 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
TURN OFF EQUIPMENT WHEN NOT IN USE | 2.6218 | I | $ 0 | $ 249 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 350 | $ 86 | 4.07 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||