| Assessment Year | 2001 |
|---|---|
| SIC | 3297 |
| SIC Description | Nonclay Refractories |
| NAICS | |
| NAICS Description | |
| Principal Product | Refractoty kiln furniture, Blocks and Liners |
| Sales | $ 62,000,000 |
| # of Employees | 290 |
| Plant Area (Sq.Ft.) | 142,000 |
| Annual Production | 25,000,000 Pounds |
| Production Hrs. Annual | 6,500 |
| Location (State) | MA |
| Yearly Energy Cost | $ 1,294,528 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,701,597 kWh | $ 467,113 | $ 0.061 /kWh |
- Demand Charge |
26,343 kW | $ 154,032 | $ 5.85 /kW |
- Electricity Fees |
- | $ 783 | - |
Natural Gas |
49,725 MMBtu | $ 279,092 | $ 5.61 /MMBtu |
Fuel Oil #2 |
53,294 MMBtu | $ 349,705 | $ 6.56 /MMBtu |
Other Energy |
8,857 MMBtu | $ 43,803 | $ 4.95 /MMBtu |
TOTAL ENERGY |
190,817 MMBtu | $ 1,294,528 | $ 6.78 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
-1,451,499 kWh 0 kWh |
$ -88,460 $ 0 |
-18.94 % 0.00 % |
$ 0.061 /kWh |
- Demand Charge |
-2,238 kW 0 kW |
$ -13,092 $ 0 |
-8.50 % 0.00 % |
$ 5.85 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,320 MMBtu 0 MMBtu |
$ 8,145 $ 0 |
2.92 % 0.00 % |
$ 5.61 /MMBtu |
Fuel Oil #2 |
7,458 MMBtu 0 MMBtu |
$ 45,270 $ 0 |
12.95 % 0.00 % |
$ 6.56 /MMBtu |
Other Energy |
896 MMBtu 0 MMBtu |
$ 4,435 $ 0 |
10.12 % 0.00 % |
$ 4.95 /MMBtu |
TOTAL ENERGY |
-5,204 MMBtu 0 MMBtu |
$ -43,702 $ 0 |
-3.38 % 0.00 % |
$ 6.78 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ADOPT IN-HOUSE MATERIAL GENERATION | 4.2120 | N | $ 500,000 | $ 268,341 | 1.86 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
RECOVER HEAT FROM OVEN EXHAUST / KILNS | 2.2432 | N | $ 154,000 | $ 45,270 | 3.40 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 9,960 | $ 7,963 | 1.25 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
USE MINIMUM SAFE OVEN VENTILATION | 2.2212 | N | $ 14,200 | $ 7,334 | 1.94 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
RECOVER HEAT FROM OVEN EXHAUST / KILNS | 2.2432 | N | $ 12,650 | $ 5,936 | 2.13 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 255 | $ 1,235 | 0.21 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 2,000 | $ 1,219 | 1.64 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||